Log in
Forum
Topic

online form

NC-2009 MRc2: Construction Waste Management
posted by Rick Vayo on Feb 14, 2011, 11:03 pm

Hi, I'm having trouble with the online form. I've filled in the required information, but the percentage of waste diverted is not totaling for me. I'm not sure what I'm doing wrong.

...

Last reply: Valerie Walsh, Feb 24, 2011, 2:48 pm

minimum area of neighborhood required?

NC-2009 SSc2: Development Density and Community Connectivity
posted by Pete Larsen on May 26, 2010, 3:30 pm

The credit requires the site to be within 1/2 mile of a neighborhood with minimum 10 units per acre. Is there a minimum area of neighborhood required? For example, does 10% (or any particular...

Last reply: Larry Jones, Feb 24, 2011, 1:50 pm

LEED-ND vs. LEED-NC why would I choose to follow one and not the

LEED Rating System Selection
posted by Andrew Slusser on Feb 22, 2011, 11:50 am

Hi Everyone,

I am looking for some help if anyone has looked at the 2 rating
systems side by side. I am working with a company that is looking at
either certifying buildings...

Last reply: Allison Beer McKenzie, Feb 24, 2011, 1:20 pm

Unit Clarification

CI-2009 SSc2: Development Density and Community Connectivity
posted by Heather Eberhardt on Dec 6, 2010, 1:47 pm

I wanted to know if anyone could tell me how many units you need in a half a mile radius. I am a little confused on how to calculate the 10 units per acre.

Last reply: Larry Jones, Feb 24, 2011, 12:19 pm

continuation of multiple buildings conversation

General forums
posted by Joanna Jenkins on Feb 10, 2010, 10:01 am

Just to be clear, as we saying that multiple buildings must be registered separately- and, therefore, must pay separate registration and certification fees? This wil multiply the tracking and...

Last reply: Tristan Roberts, Feb 24, 2011, 11:08 am

Metallic Glaze that is LEED complaint

NC-2009 IEQc4.2: Low-emitting materials - paints and coatings
posted by Megan Bove on Feb 22, 2011, 7:54 am

In reviewing submittals with the painting trade on my project, we came across the specified a specified paint that we are looking for a substitute. The reason for this is the product does not...

Last reply: Tristan Roberts, Feb 24, 2011, 10:52 am

RE: LEED 2009 to AGMBC 2010 registration

LEED Guidance for Campuses and Multiple Buildings
posted by Katherine Ann Resurreccion on Jan 24, 2011, 12:35 am

My project is a Mixed-Use development. It consists of 3 residential condominium towers erecting on a single podium building, which will function as a mall.

Currently this project is...

Last reply: Tristan Roberts, Feb 24, 2011, 10:24 am

Electric bicycles in Asia

NC-2009 SSc4.2: Alternative transportation - bicycle storage and changing rooms
posted by Louise Schlatter on Jan 31, 2011, 1:48 pm

We are starting to get projects in Asia and have learned that they use both standard (human operated) bicycles and also something we don't have in the US: electric bicycles. These are not...

Last reply: Melissa Merryweather, Feb 24, 2011, 10:16 am

Phased Occupancy and IAQ Testing

CI-2009 IEQc3.2: Construction IAQ management plan - before occupancy
posted by Melissa Wrolstad on Feb 22, 2011, 5:11 pm

I have a CI project with 4 floors and phased occupancy. Two floors will be occupied while two are still under construction. Is it possible to split...

Last reply: Susann Geithner, Feb 24, 2011, 9:53 am

Cleaning contract for roll out mats

CS-2009 IEQc5: Indoor Chemical and Pollutant Source Control
posted by V. Miller on Feb 24, 2011, 12:56 am

LEED User credit checklists for this credit indicate that a copy of the cleaning contract must be provided. However, the roll out mat section of the tempalte does not have an upload button, or...

Last reply: Allison Beer McKenzie, Feb 24, 2011, 8:44 am