I have a CI project with 4 floors and phased occupancy. Two floors will be occupied while two are still under construction. Is it possible to split IAQ Testing into 2 sections (floors 1 and 2 first, and then floors 3 and 4 on a later date when they are complete) given that the two areas to be tested are on separate floors?