Topic | Recent |
---|---|
Baseline system efficiencyNC-v4 EAp2: Minimum Energy Performanceposted by Greenlab on Jul 3, 2019, 2:17 pm
Hello everyone, I am modeling a baseline system No. 6 - Packaged... Last reply: Marcus Sheffer, Jun 12, 2025, 11:58 am |
|
Comprehensive composting in small building officePilot-Credits SSpc129: Comprehensive Compostingposted by Belén Valladares López on Jun 12, 2025, 7:02 am
We are pursuing this credit for a small office building under LEED Core & Shell. One of the requirements for the credit is to " Arrange outreach and education procedure for the... |
|
Nearly-Zero Energy Building (NZEB) standard?Pilot-Credits INpc164: EU Taxonomy for Climate Change Mitigationposted by Eric Shamp on Jun 11, 2025, 4:59 pm
Has anyone found a suitable nearly-zero energy building standard for projects located in the US, or specifically in California? I'm inclined to use 2022 Title-24 baseline site EUI, but wondering... |
|
Athletic Fields and Playground turf exempt? what about theatre / assembly spaces that may have turf?NC-v4 WEp1: Outdoor water use reductionposted by Lou Niles II on Oct 3, 2019, 6:54 pm
Hello, has anyone ever had a situation where a you had turf in a space that was not an Athletic Field or Playground but was used for... Last reply: Joyce Kelly, Jun 11, 2025, 11:22 am |
|
LEED v4.1 Option 2 for LEED v4 compliance Electric vehiclesNC-v4 LTc8: Green vehiclesposted by Erik Heuler on May 7, 2025, 3:34 pm
There are some differences between LEED v4 and v4.1 requirements for Electric Vehicle charging. Does anyone know if Option 2 in v4.1 (EV ready infrastructure) can be used as an... Last reply: Erik Heuler, Jun 11, 2025, 10:17 am |
|
Does Emergency Equipment need to be Included in the Calculations?NC-v4 EAc6: Enhanced Refrigerant Managementposted by Kristina K on Jun 10, 2025, 5:02 pm
Hello, Working on a project that has a split system that is used for emergency situations only (i.e., power outages). As the unit will not be used continuously during regular building... |
|
Overall Feedback on Pilot CreditPilot-Credits MRpc87: Verified Construction & Demolition Recycling Ratesposted by Kavita Karmarkar on Mar 21, 2024, 5:32 pm
As our project is located in Northern CA, it is not diffidult to achieve this credit as there are many haulers with third-party certified diversion rates (RCI) in the area. They may not be lowest... Last reply: Kristina Day, Jun 6, 2025, 7:03 pm |
|
MRpc87 Verified C&D Recycling RatesNC-v4 INc1: Innovationposted by Kath Williams on Jun 6, 2025, 5:57 pm
This pilot credit was very easy to achieve because the project is in California. Our hauler held Certification of Recycling Rates issued by the Recycling Certification Institute. Based on the... |
|
HPD: products with same technical charachteristics but different thickness, are considered distincts products (BA13/BA15, BA18)NC-v4 MRc4: Building product disclosure and optimization - material ingredientsposted by Sara BENLOUBA on Nov 2, 2022, 9:25 am
Hello everybody, We used on our project plasterboards from the same manufacturer (Saint gobain), which have the same characteristics (acoustics, thermal resistance,) but they are different... Last reply: Katrina Kashinejad, Jun 5, 2025, 9:01 am |
|
Integrative Analysis of Building Materials- Work Smarter, Not HarderPilot-Credits MRpc103: Integrative Analysis of Building Materialsposted by Marina Rullo on Oct 23, 2023, 12:16 pm
This pilot credit is a useful way to both qualitatively and quantitatively examine the human health implications, environmental impacts, and safety impacts of building materials. We’ve... Last reply: Elizabeth Bautista, Jun 4, 2025, 12:02 pm |