Credit Substitution Point MismatchNC-v4.1 SSc4: Rainwater managementposted by Grace Friedhoff on Feb 3, 2023, 8:59 am
We are registered as a v4 project but would like to substitute the Rainwater Management credit for version 4.1. However the credit thresholds do not update in LEEDonline when you substitute. How... |
|
regional priority credits V4.1 New ConstructionNC-v4.1 RPc1: Regional Priorityposted by Angela Loughry on Feb 3, 2023, 12:14 pm
Hello- Per the Regional Priority Search screen our project qualifies for 2 regional priority points zip 81621 (surrounding... |
|
HVAC Background Noise Measurement- must be done by Acoustic Consultant?NC-v4.1 EQc9: Acoustic performanceposted by Eunice Chong on Feb 6, 2023, 9:59 pm
Hi fellow LEED experts, I have an office project which does not have an Acoustic Consultant (this is an ID project but thought I might get better luck posting it here too as it may also... |
|
BeCx- Ongoing commissioning planNC-v4.1 EAc1: Enhanced Commissioningposted by Manuelle Croft on Feb 7, 2023, 2:47 pm
The... |
|
Is Option 2 AND Option 3 possible?NC-v4.1 MRc1: Building life-cycle impact reductionposted by Ian McCall on Mar 6, 2023, 2:50 am
Dear LEED Experts, In v4.1 is possible to combine "Option 2 AND Option 3" together or is just limited to "Option 1 AND/OR Option 2 OR ... |
|
Outdoor Water Use credit- LEED V4.1NC-v4.1 WEc1: Outdoor water use reductionposted by Maria Farah on Mar 17, 2023, 12:57 pm
In LEED BD+C: New Construction V4.1, the outdoor water use reduction credit (2 points) states that alternative water sources can be used to achieve an additional 30% reduction. However, unlike in... |
|
Wooded Area as open space?NC-v4.1 SSc3: Open spaceposted by Nadia Azzam on Apr 6, 2023, 4:52 pm
Would a wooded area with lots of trees count as open space for this credit? Our project is surrounded by wooded areas that are basically... |
|
Zero Lot Line with required streetscape?NC-v4.1 LTc6: Bicycle facilitiesposted by Elena Khoury on Apr 10, 2023, 6:41 pm
Can streetscape can be excluded from a project boundary if it's required by municipality? For context, there's civil and landscape work that's occuring in front of my project that is required/... |
|
Zero Lot Line with required streetscapeNC-v4.1 MPR2: Must use reasonable LEED boundariesposted by Elena Khoury on Apr 11, 2023, 11:42 am
Can streetscape can be excluded from a project boundary if it's required by municipality? For context, there's civil and landscape work that's occuring in front of my project that is required/... |
|
Do non-contiguous habitat areas qualify?NC-v4.1 SSc2: Protect or Restore Habitatposted by Jennifer Rennick on Apr 21, 2023, 12:48 pm
We are working on a 4-acre site with multiple buildings that aims to landscape with natives as much as possible. The available planting areas are distributed across the site (a perimeter path,... |