Forum quick links
Reporting Renewable Energy Savings in Energy Model vs. Renewable Energy Section (LEED v4 energy update)
NC-v4 EAc5:Renewable energy productionposted by Anurag Ghosh on
Hi all,
I’m working on a LEED v4 energy update project utilizing multiple renewable energy systems, such as:
-
Solar PV (electricity),
Radon mitigation in High-Rise Mixed-Use project
NC-v4 EQp1:Minimum indoor air quality performanceposted by GANESH NAYAK on
A high-rise mixed-use project with two levels of office and multiple levels of residential is in EPA Zone 1 for radon.
bus rapid transit stop
NC-v4 LTc6:Bicycle facilitiesposted by Erin Holdenried on
what is the definition of a bus rapid transit stop? Can a bus transfer station count towards this? or Greyhound station? I have a project that can meet all the criteria except this one.
Baseline Calculation & AHU Condensate
Pilot-Credits WEpc115:Whole Project Water Use Reductionposted by Kim C on
The project is an industrial facility with it's own wastewater treatment system.
WPWUR Innovative ideas question
Pilot-Credits WEpc115:Whole Project Water Use Reductionposted by Carlos De Leon on
Hello, I am exploring APC- WPWUR with my team to achieve more credits.
Requirement for Hand held Device for IAQ Performance Credit
EBOM-v4.1 EQp4:Indoor Environmental Quality Performanceposted by shashank gangil on
Is there any minimum requirement for Hand held device to measure TVOC and CO2? I cant find any on LEED Guide. Is there any calibration requirement?
Has anyone received feedback for Path 1 - Develop a Standard Green Lease?
Pilot-Credits EApc159:Green Leases ACPposted by Kristina K on
Lowest flow shower on the market
NC-v4 WEp2:Indoor water use reductionposted by Sophie Kerr on
What is the lowest flow shower you've come across? The lowest we have is 5.7 LPM (1.5 GPM).
Are CO sensors needed for lodging units with no kitchen facilities
NC-v4 EQp1:Minimum indoor air quality performanceposted by Alokmay Behera on
There is a labor accomodation project with the no cooking facilities whatsoever. There will be centralised kitchen facility for the project. Do we still need to have CO sensors one per unit?