Topic | Recent |
---|---|
Manufacturing processNC-v4 EAp2: Minimum Energy Performanceposted by ignacio furniés on Aug 5, 2016, 12:10 pm
My question is regarding the EAp2 and EAc3, our project consists of a palm oil manufacturing facility. The energy intensive manufacturing process exceeds an estimated 90% of the facility's total... Last reply: Marcus Sheffer, Aug 9, 2016, 9:56 am |
|
Demonstrate Savings for CRAC UnitsCI-2009 EAc1.3: Optimize energy performance - HVACposted by Gabriela Crespo on Aug 5, 2016, 1:04 pm
Dear all, Same project as before, Central Chilled Water System, not in our scope. The only HVAC equipment in our scope are 2 CRAC units for the office's SITES. If we want to demonstrate... Last reply: Marcus Sheffer, Aug 6, 2016, 2:33 pm |
|
Ask about light and views IndexNC-2009 IEQc8.1: Daylight and views - daylightposted by Jose Alfonso Vergara Vasquez on Jul 21, 2016, 11:12 pm
Hi , I wonder what happens when you have more windows than is required and the index exceeds the recommended? Last reply: TODD REED, Jul 22, 2016, 8:07 am |
|
SR Natural stoneNC-v4 SSc5: Heat Island Reductionposted by Juan Carlos Contreras on Jul 19, 2016, 2:59 pm
Hello, Last reply: Summer Minchew, Jul 19, 2016, 3:29 pm |
|
Daylight controlsCI-v4 EAp2: Minimum Energy Performanceposted by Gabriela Crespo on Jul 18, 2016, 1:28 pm
Dear all, We are working on a project to be certified CI v4. The use is a software development office, the building is 100% glazing in a very hot climate. The owner will be installing... Last reply: Gabriela Crespo, Jul 18, 2016, 2:46 pm |
|
Interpretation ProblemCI-2009 EAc1.3: Optimize energy performance - HVACposted by Maria Isabel Conde on Jul 8, 2016, 12:46 pm
We have a problem with the interpretation of the information necessary to apply for this credit. Credit requirement explain that I have to meet one of the following: Air handlers that... Last reply: Maria Isabel Conde, Jul 12, 2016, 2:45 pm |
|
Energy Metering for Multi-tenant buildingEBOM-v4 EAc5: Advanced Energy Meteringposted by Gabriela Crespo on Jul 7, 2016, 11:59 am
Dear all, We are working on a LEED EB project that wants to explore this credit, I understand the requirements are to monitor all energy sources, as the pre-requisite states, and... Last reply: Dave Hubka, Jul 7, 2016, 12:38 pm |
|
Equipment not list on CPGCI-2009 EAc1.3: Optimize energy performance - HVACposted by Maria Isabel Conde on Jul 1, 2016, 5:53 pm
Our project has a WSHP bigger than 135000 btu/h. According to CPG table 2.9.2 the efficiency required for WSHP up to 135000 btu/h is 14 EER and the WSHP of our project has a 14.1 EER. ... Last reply: Maria Isabel Conde, Jul 5, 2016, 12:23 pm |
|
LEED EAc2 for CampusNC-2009 EAc2: On-Site Renewable Energyposted by Mauricio Ramirez on Mar 15, 2016, 12:51 pm
Hello. I'm working on a Campus project that are designing a large PV installation in the roof and façade of the different building as they are built, but that will cover also areas outside of the... Last reply: Mauricio Ramirez, Jul 1, 2016, 3:44 pm |
|
% of Glazing & Floor Area Base Case vs ProjectCS-2009 EAp2: Minimum Energy Performanceposted by Dana Guzman on Jun 10, 2016, 11:36 pm
Hi, I am new to LEED and looking at the energy model submitted by our consultant for the compliance on EAp2. I have a basic question. Should the base case scenario and the real project be... Last reply: Christopher Schaffner, Jun 16, 2016, 11:00 pm |