Project Name maximum character limitLiving with LEED Online - quirks, bugs and hiccupsposted by Manivannan Devaraj on Jan 21, 2020, 3:35 am
What is the maximum character limits for Project Name character Last reply: Bill Swanson, Jan 21, 2020, 10:39 am |
|
7.6.1.2 Extracting Fan Power – Baseline DesignNC-v4 EAc2: Optimize Energy Performanceposted by Amal Venugopal on Nov 4, 2019, 8:59 am
Hi Sir, Greetings! The following content is copied from, Page No,38 of... Last reply: Tyler Thumma, Dec 20, 2019, 11:01 am |
|
WE Outdoor water reductionNC-v4.1 WEp1: Outdoor water use reductionposted by Geneva Guerin on Dec 13, 2019, 3:42 pm
Are potted plants and trees (in raised beds on outdoor covered terraces within the site boundary), counted as vegetated surfaces for this prerequisite? Last reply: Dave Hubka, Dec 17, 2019, 4:16 pm |
|
four buildings with a public squareND-Plan-v4 NPDp1: Walkable Streetsposted by Sareet Benayahu on Oct 10, 2018, 7:11 am
Hi, Our LEED ND-Plan Project has a few Large Lots, on which there are three or four buildings planned at the edges of the lots and in the center a large public square. There are wide... Last reply: David Posada, Nov 25, 2019, 8:22 pm |
|
Does the LCA must cover the 100% of building envelope and structural elements?NC-v4 MRc1: Building life-cycle impact reductionposted by Sara BENLOUBA on Oct 16, 2019, 12:20 pm
To earn the 3 points on this credit, Question 1: Do I need to know life cycle analysis for 100% of my structural and envelope products? Even small products like tightness, ...? steel that exists... Last reply: Panu Pasanen, Oct 18, 2019, 4:15 am |
|
municipality irrigation lineCS-v4 WEc1: Outdoor water use reductionposted by Radwa Amin on Apr 1, 2017, 11:54 am
the district that the project is located in has a municipality water line dedicated to irrigation and it is not potable water (recycled). Last reply: , Oct 15, 2019, 3:26 am |
|
Modeling baseline with System 2 of proposed hotel building with system 8CS-v4 EAp2: Minimum Energy Performanceposted by Natalia Quintanilla on Oct 9, 2019, 6:32 pm
Hi, I'm modeling a 12-floor hotel building located in Dubai that uses System 8:... Last reply: Natalia Quintanilla, Oct 14, 2019, 2:50 pm |
|
ASHRAE 90.1.2010 Mandatory & Prescriptive Requirements vs Energy ModelCI-v4 EAc2: Optimize Energy Performanceposted by SSN Energy Model on Oct 9, 2019, 9:57 am
Hi to all, I am doing energy model for one of our LEED CI Project under v4 rating system. The following contents are copied from reference guide, Option 1. Tenant-level... Last reply: Marcus Sheffer, Oct 11, 2019, 10:17 pm |
|
Can consider the air cooled chiller yard as central plantCI-v4 EAp2: Minimum Energy Performanceposted by SSN Energy Model on Oct 9, 2019, 10:23 am
Hi to all, Greetings! I am doing Energy Model as per design documents of office space which has target for LEED ID+C Gold v4. The baseline system should be System 8 (... Last reply: Marcus Sheffer, Oct 11, 2019, 9:50 am |
|
ASHRAE 90.1.2010- Baseline System using Exception of G3.1.1CI-v4 EAp2: Minimum Energy Performanceposted by SSN Energy Model on Oct 2, 2019, 2:01 am
Hi, Greetings! We are doing the energy model for Office space which has registered under LEED ID+C v4. The overall floor area of the project space is 45,000 Sq.ft & the overall... Last reply: SSN Energy Model, Oct 2, 2019, 8:49 pm |