Topic | Recent |
---|---|
LTc Compact & ConnectedLEED v5 BD+C/ID+C: Location and Transportation Public Commentsposted by Emily Purcell on Apr 16, 2024, 2:07 pm
"The counted uses must represent at least three of the five categories, exclusive of the building’s primary use category." This language has posed a challenge for projects in v4/4.1... Last reply: Dave Hubka, Apr 16, 2024, 2:59 pm |
|
Pilot Closed- attending LEED v4.1 Optimize Process Water UsePilot-Credits WEpc94: No Cooling Towerposted by Adriana Hansen on Apr 16, 2024, 1:45 pm
This pilot credit has been used in many office projects with VRF system and at least one of the baseline system(s) designated for the building using ASHRAE 90.1-2010 Appendix G Table G3.1.1... |
|
Pilot Closed- attending LEED v4.1 Optimize Process Water UsePilot-Credits WEpc94: No Cooling Towerposted by Adriana Hansen on Apr 16, 2024, 1:39 pm
This pilot credit allows to many office buildings that have a VRF system and at least one of the baseline system(s) designated for the building using ASHRAE 90.1-2010 Appendix G Table G3.1.1... |
|
EAc Reduce peak thermal loadsLEED v5 BD+C/ID+C: Energy and Atmosphere Public Commentsposted by Emily Purcell on Apr 16, 2024, 12:26 pm
Very happy to see a heavily weighted credit breaking out thermal loads from the whole building energy model credit. This will be a great incentive not to ignore envelope even in buildings where... |
|
CONSTRUCTION WASTE HEATED FOR CLINKER PRODUCTION, COUNTED AS WASTE DIVERSION?NC-v4 MRp2: Construction and demolition waste management planningposted by Olga Yuil on Apr 15, 2024, 3:55 pm
For a project located in Central America, construction waste is used for clinker production. For this purpose, construction waste is heated to temperatures above 900C. According to those... |
|
Wind PPA OR PV garden questionNC-v4 EAc5: Renewable energy productionposted by Kyu-min Lee on Apr 15, 2024, 1:29 pm
Hello,LEEDuser!!!! My project is planning to contract at least 10year more than 10 Gwh.(not confirmed about wind or PV but the amount is fixed, located in same utility service area) ...Last reply: Kyu-min Lee, Apr 15, 2024, 4:28 pm |
|
What are the key objectives of the Plastic Recycling Show in India 2024?NC-2009 MRc4: Recycled Contentposted by Stive John on Apr 15, 2024, 6:21 am
The Plastic Recycling Show in India 2024 aims to promote awareness and adoption of innovative recycling... |
|
Mean Lamp LumensEBOM-v4 SSc4: Light Pollution Reductionposted by Subhashkumar A on Apr 14, 2024, 11:59 am
Hi all! Last reply: Bill Swanson, Apr 19, 2024, 8:54 am |
|
MRc Low Emitting MaterialsLEED v5 BD+C/ID+C: Materials and Resources Public Commentsposted by Emily Purcell on Apr 12, 2024, 1:41 pm
Overall: I like the simplified point & percentage threshold... |
|
Heat Island Reduction- vegetated surface- modular systemsNC-v4 SSc5: Heat Island Reductionposted by Ricardo Hernandez on Apr 12, 2024, 10:23 am
Hi Forum, can anyone confirm that a modular vegetated systems (plastic modules with ecomembrane, above ground) can count on the calculations for the vegetated surface, i would like to implement a... |