LCA for only furniture, is it possible?CI-v4.1 MRc2: Interiors life-cycle impact reductionposted by Eslam Ahmed on Oct 9, 2024, 3:53 pm
We are currently working on a LEED ID+C certification project. It involves a rental space where our customer is just the tenant, who will take over the space fully finished. He is only... Last reply: Eslam Ahmed, Oct 25, 2024, 5:42 am |
|
Is drywall considered a demountable feature?CI-v4.1 MRc2: Interiors life-cycle impact reductionposted by Andrea Tayah Esperão Malta de Campos on Jun 28, 2024, 11:39 am
I am working on a project for a commercial interior planning under ID+C certification that opted mainly for an open space plan but in certains areas there are some drywalls to convey privacy and... |
|
Interiors Life-Cycle Impact Reduction- Option 3 Design for FlexibilityCI-v4.1 MRc2: Interiors life-cycle impact reductionposted by Laura Riegle on Jul 13, 2022, 9:26 am
Hi, I am persuing the "Interiors Life-Cycle Impact Reduction" credit, Option 3: Design for Flexibility for a CI project. In the project, there are concrete floors (no systems to... Last reply: Brightworks Sustainability, May 7, 2024, 9:27 pm |
|
Can EC3/TallyCAT be used for Option 3: Building Interiors Life Cycle Assessment?CI-v4.1 MRc2: Interiors life-cycle impact reductionposted by Nikhita Sapuram on Aug 8, 2023, 12:03 pm
Most WBLCA software programs do not include product specific data. For a tenant improvement project would it be acceptable to use a program that only looks at environmental impacts from cradle to... Last reply: Kate Holly, Mar 21, 2024, 2:32 pm |
|
50% surface area reuseCI-v4.1 MRc2: Interiors life-cycle impact reductionposted by Mark Ragucci on Jan 15, 2020, 9:40 am
how is this credit calculated? can in include existing floor slab and deck? we are leaving a portion of the exiting walls that are about 20ft tall and our ceilings will be at 9'. can i calculate... Last reply: Stephani Carter, Mar 5, 2024, 7:34 pm |
|
Pursuing Furniture reuse--cost vs. value of repurposed or refurbished itemsCI-v4.1 MRc2: Interiors life-cycle impact reductionposted by Lisa Adams on Jan 25, 2024, 8:10 pm
Refurbished or repurposed items would be less costly than purchasing new, i.e.: a refurb task chair may be free or half the cost of a new one. The credit lanugage states to "include the total... Last reply: Summer Minchew, Jan 26, 2024, 11:27 am |
|
Path 3: Proposed building values exceeding 5% in one category.CI-v4.1 MRc2: Interiors life-cycle impact reductionposted by Gaston Michaud on Jul 18, 2023, 1:13 pm
Hi everyone, We have a project that has several design optimizations and is reusing most of the furniture and some walls. The LCA shows the proposed construction with a 20% reduction in... Last reply: Sarah Buffaloe, Aug 8, 2023, 1:55 pm |
|
Can reuse of an existing sealed or polished floor be included?CI-v4.1 MRc2: Interiors life-cycle impact reductionposted by on May 18, 2023, 3:59 pm
And in this case, since the slab is structural, the replacement cost would just be the cost of the sealant or polishing process, right? And in cases where an existing slab is being re-... |
|
Can we benefit from the building reuse of a single tenanted building?CI-v4.1 MRc2: Interiors life-cycle impact reductionposted by Peter Doo on Sep 18, 2021, 12:46 pm
We are working on a single tenanted building. The building was gutted prior to the start of tenant negotiation. We are using the stairs and elevator (about all that remains). Can we take credit... Last reply: Susan Di Giulio, Oct 28, 2022, 4:01 pm |
|
Building Interiors Life Cycle Assessment- Reuse and/or Salvage MaterialsCI-v4.1 MRc2: Interiors life-cycle impact reductionposted by Amanda Cunningham on Oct 14, 2022, 8:10 am
We are considering pursuing option 3 Building Interiors Life Cycle Assessment. Has anyone pursued this option and included "building... |