Log in
Forum
Topic

Applicability to sleeping rooms (dorm or army barracks)

NC-v4 EQc5: Thermal comfort
posted by Ken Gallegos on Jul 15, 2018, 10:26 am

Just want to verify that this credit still applies to sleeping rooms? i.e. hotel rooms, dormatory, etc.

We are doing an army barracks with rooms that 4 soldiers sleep in (college dorm type...

Last reply: Emily Purcell, Apr 25, 2024, 2:21 pm

Control for Detention/rehab facilities

NC-v4 EQc5: Thermal comfort
posted by Rob Mark on Jun 11, 2019, 12:41 pm

Hello,

We have a facility that is a detoxification center for youth that has a number of secure rooms for several weeks stay for each patient/detainee. There are controls for the space but...

Last reply: Danielle Waters, Apr 25, 2024, 12:18 pm

Thermal Comfort Strategies for Factory Project: Leed Certification Query

NC-v4.1 EQc5: Thermal comfort
posted by Alefiya Bhiwandiwala on Apr 25, 2024, 3:19 am

Hello everyone,

We're currently working on a factory project that includes both...

Smoking policy required in countries where workplace smoking is not permitted by law

CS-v4 EQp2: Environmental tobacco smoke control
posted by Rachael McGinley on Apr 25, 2024, 5:11 am

Hi, i've had a very good question from a client. Why does LEED require a no-smoking policy in countries where workplace smoking is not permitted by law?

Has anyone provided a reference to...

IEQc Occupant experience

LEED v5 BD+C/ID+C: Indoor Environmental Quality Public Comments
posted by Emily Purcell on Apr 10, 2024, 1:00 pm

I like the overall approach of this credit. I often found in v4/4.1 that minor, common obstacles (not having the proper...

Last reply: Andrew Hathaway, Apr 24, 2024, 2:23 pm

Ceramic Tile Again

NC-2009 IEQc4.3: Low-emitting materials - flooring systems
posted by Panupant Phapant on Sep 17, 2012, 4:42 am

Dear alls,
I am so confused about the exception for ceramic tile for FloorScore. Normally the ceramic tile has a coating process before burn with high temperature so...

Last reply: Edgar Arevalo, Apr 24, 2024, 1:49 pm

Guidance on Onsite Compost Processing for SSpc129 / Pilot Credit

NC-v4.1 INc1: Innovation
posted by Teresa Cortes on Jan 29, 2024, 3:06 pm

Hi Everyone,

I'm working on a project that's exploring SSpc129 Comprehensive Composting, with a focus on onsite compost processing. Our goal is to enhance waste management and...

Last reply: Rebecca Rice, Apr 24, 2024, 12:35 pm

Fuel type for system-5 Packaged system with reheat

NC-v4.1 EAp2: Minimum Energy Performance
posted by John on Apr 24, 2024, 2:21 am

Hi Folks,

I am working on an energy model for non-residential building. The baseline system would be system-5 Packaged system with reheat. As per ASHRAE 90.1 Table G3.1.1B, the heating...

Last reply: Tyler Thumma, Apr 24, 2024, 11:36 am

Water Reduction- Combi Oven requirement

NC-v4.1 WEc2: Indoor water use reduction
posted by mika sundberg on Apr 24, 2024, 11:24 am

We are working on a community building with a commisarry kitchen program. Our kitchen consultant cannot find a combi oven, that is accessible that meets the LEED requirements. Does anyone have a...

Certification of offshore buildings?

NC-v4.1 MPR1: Must be in a permanent location on existing land
posted by Mazin Hakim on Apr 24, 2024, 5:32 am

Hello,

I am working on a unique project that is going to be constructed on purpose-built FIXED and PERMANENT platforms in the sea, about 30 miles from the shoreline. The project is mainly...