Topic | Recent |
---|---|
Outdoor water use minimum requirementsCS-v4 WEp1: Outdoor water use reductionposted by Gabriela Mena on Oct 1, 2018, 11:21 am
Hi, We are developing a CS project, even that the project is not pursuing the minimum percentage required for open space and vegetated areas, it has some pots. In order to... Last reply: Andrey Kuznetsov, Apr 1, 2022, 2:42 am |
|
Interior Irrigation?NC-v4 WEp2: Indoor water use reductionposted by Allison Wilson on Oct 1, 2019, 10:02 am
Our project has interior planting which will be irrigated. Obviously there's nowhere in the Indoor Water Use calculator for irrigation since it addresses only flush/flow fixtures, but it... Last reply: Dave Hubka, Mar 31, 2022, 9:27 pm |
|
New WaterSense requirements don't align with LEED v4NC-v4 WEp2: Indoor water use reductionposted by Bethany Beers on Mar 31, 2022, 12:11 pm
Has anyone explored the discrepancy that has been created by the new WaterSense requirements for flush fixtures at 1.28 gpf minimum? We're now getting cut sheets for projects that have 1.6/1.1... Last reply: Allen Cornett, Mar 31, 2022, 4:26 pm |
|
Pilot credit required documentation experiencePilot-Credits IPpc89: Social equity within the communityposted by Evgeniya Barabasz-Lynn on Jun 26, 2020, 5:59 pm
Our project is pursuing the pilot credit “Social equity within the community”, using option 2 - Partner with Existing Community Service. There is not much information available for this... Last reply: Michelle Rosenberger, Mar 30, 2022, 6:43 pm |
|
RECs SuppliersNC-v4 EAc7: Green power and carbon offsetsposted by Charalampos Giannikopoulos on Mar 30, 2022, 11:25 am
Hi all! Is there a directory with international suppliers of Green Power certificates (... |
|
Cool Walls- material compliance (pre-cast concrete)Pilot-Credits SSpc154: Heat Island Mitigation with Cool Wallsposted by Nicolette Francis on Mar 30, 2022, 10:48 am
Hi, does anyone know if pre-cast concrete can be used to comply with cool walls? it can be used for heat island to assist credit achievement and I am wondering if this same... |
|
Renovation Project with Zero Lot LineCS-v4 WEp1: Outdoor water use reductionposted by Somsak Jidmon on Feb 28, 2022, 9:54 am
I got a renovation project of the 7 stories existing building to the office which aims to be LEED-CS but the project contains zero lot line. Is it possible to pass this prerequisite? Last reply: Somsak Jidmon, Mar 30, 2022, 10:16 am |
|
Negative EToCS-v4 WEp1: Outdoor water use reductionposted by Laura Chávez on Jul 13, 2020, 8:15 pm
I'm using the Outdoor water use reduction calculator_v02 from the resources tab since the project its outside USA. I'm entering the data for the monthly rainfal and Monthñy ETo from the IWMI site... Last reply: Andrey Kuznetsov, Mar 30, 2022, 10:10 am |
|
LEED v4.1 Renewable Energy- no contracts with a period longer than two years availableNC-v4.1 EAc5: Renewable energyposted by J Schütz on Apr 2, 2020, 10:30 am
Dear all, Actually, German law prohibits electricity contracts with a fixed contract period longer than two years, there has to be the possibility to cancel the contract. Although, the... Last reply: Hashir Usman, Mar 30, 2022, 7:44 am |
|
Mixed Use energy calculations!Mid-Rise-v4 EAp1: Minimum Energy Performanceposted by Karen Joslin on Sep 17, 2018, 1:37 pm
Still confused about how to treat/account for the first floor for the retail/commercial spaces with 4 stories of apartments above. LEED v4 Homes-Midrise being applied, but do we do separate... Last reply: Charles Nepps, Mar 30, 2022, 6:40 am |