Still confused about how to treat/account for the first floor for the retail/commercial spaces with 4 stories of apartments above. LEED v4 Homes-Midrise being applied, but do we do separate calculations based in ASHRAE 90.1 simulations and ASHRAE 62.1 ventilation using the NC thresholds, etc?