Log in
Forum
Topic

How do I calculate the total runoff, if I am required to send rainwater elsewhere?

EBOM-v4.1 SSc1: Rainwater management
posted by Rick Fox on Aug 10, 2023, 4:13 pm

I have so many questions concerning storm water management.   My company is a large warehouse.  We have 350 truck parking spots as well as 150 employee parking spots and a 525,000 square foot...

More elaboration on the long-term storage

CI-v4.1 LTc4: Bicycle facilities
posted by CRB Sustainability on Jun 7, 2023, 10:47 am

We are currently certifying under CI 4.1, and I would like to gain a deeper understanding of the requirements for long-term storage of bikes located outside of the building. I came across an...

Last reply: Laura strauss, Aug 10, 2023, 1:47 pm

Averaging Facility Rates over Time

Pilot-Credits MRpc87: Verified Construction & Demolition Recycling Rates
posted by Vanessa Hostick on Aug 10, 2023, 11:11 am

The credit guidance notes that to apply rates over time, a project's waste should be the weighted average for the facility over the time in which the project sent materials to the facility. ...

Last reply: Michelle Rosenberger, Aug 10, 2023, 11:43 am

Option 2: Emergency Preparedness Planning Red Cross Form Examples

Pilot-Credits IPpc98: Assessment and planning for resilience
posted by Julia Manion on Aug 9, 2023, 5:50 pm

Does anyone have an example of the American Ready Cross 123 Assessment and Facility Description Forms to preview before attempting this credit??? I would like to determine if those forms are...

OPR & BOD & Design Document review

NC-v4 EAp1: Fundamental commissioning and verification
posted by Dave Hubka on Sep 30, 2021, 3:28 pm

Fundamental Commissioning requires the...

Last reply: Edgar Arevalo, Aug 9, 2023, 7:03 pm

Schedule for Data Center Load

NC-v4 EAp2: Minimum Energy Performance
posted by Rajat Wadhwa on Aug 7, 2023, 3:14 pm

Hi I am modeling a Data Center what schedule should I use for IT loads, should I run it for 100% all the time?

Last reply: Marcus Sheffer, Aug 9, 2023, 4:37 pm

Renewable Energy Production

NC-v4 EAp2: Minimum Energy Performance
posted by Piotr Adamczyk on Aug 9, 2023, 2:32 am

Dear All,

I want to ask you how you approach taking into account the yield of the photovoltaic installation in the MEPC calculator.
I received the yield calculation from the designer...

Last reply: Marcus Sheffer, Aug 9, 2023, 4:27 pm

Path 3: Proposed building values exceeding 5% in one category.

CI-v4.1 MRc2: Interiors life-cycle impact reduction
posted by Gaston Michaud on Jul 18, 2023, 1:13 pm

Hi everyone, 

We have a project that has several design optimizations and is reusing most of the furniture and some walls. The LCA shows the proposed construction with a 20% reduction in...

Last reply: Sarah Buffaloe, Aug 8, 2023, 1:55 pm

Baseline Model for Data center Economizer

NC-v4 EAp2: Minimum Energy Performance
posted by Rajat Wadhwa on Aug 8, 2023, 12:36 pm

Hi, 

I have encountered an issue with the baseline model for Data Center , based on LEED Comments we are using system 8 and for climate zone 5a the economizer shut off limit is 70F, the...

Last reply: Moses Chong, Aug 8, 2023, 12:55 pm

All Gender Restrooms- Extent of Hygiene Product Distribution

NC-v4 INc1: Innovation
posted by Summer Minchew on Apr 2, 2021, 10:56 am

The All Gender Restrooms Pilot general requirements state: "Facilities should provide means for the distribution of menstruation hygiene products." This is a little vauge, does this mean every...

Last reply: Graham Linn, Aug 7, 2023, 8:18 pm