Log in
Forum
Topic

Joint Compound and Joint Tape- GREENGUARD Gold requirements

NC-v4.1 EQc2: Low-emitting materials
posted by Jason Biondi on Jul 29, 2019, 3:08 am

Here is the technical advice we receive for one of the project:

"Provide general emissions evaluation results for ProForm All Purpose Joint Compound and Joint Tape. The documentation for...

Last reply: Edgar Arevalo, Jul 17, 2024, 1:50 pm

Integrative Analysis of Building Materials

Pilot-Credits MRpc103: Integrative Analysis of Building Materials
posted by on Jan 5, 2023, 10:45 am

The project team is pursuing this pilot credit after achieving BPDO EPD and HPD credits. Analyzing a combination of EPDs, HPDs, and Safety Data Sheets for the products installed allowed the team...

Last reply: Gabrielle Gambino Lyon, Jul 17, 2024, 12:14 pm

Hard-lid ceiling with access panel

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by on Jul 16, 2024, 2:42 pm

For interior cross-contamination prevention - Has anyone successfully submitted a project with an access panel in a hard lid ceiling? Deck to deck partitions aren't feasible for the janitor's...

RECs in EBOM 4.1

EBOM-v4.1 EAp3: Energy Performance
posted by Christian Garcia on Apr 18, 2024, 10:50 am

I came across an old video where it is explained this version doesn't take into account the purchase of RECs but it is considered for the future. This video is from 5 years ago. Does anyone know...

Last reply: Alexis Voeltner, Jul 16, 2024, 1:27 pm

Ventilation Requirements for Sporadically Used Spaces

NC-v4 EQp1: Minimum indoor air quality performance
posted by Santiago Avila on Sep 6, 2023, 7:24 am

Hello everyone,

I have a question regarding which areas should be ventilated. In our project, a residential building, we have spaces on the ground floor designated for flexible work areas...

Last reply: Afogreen Build, Jul 15, 2024, 9:56 pm

What does the "three times the head height" measure mean?

CS-v4 EQc5: Quality Views
posted by Marine Petrosyan on Sep 5, 2023, 10:54 am

There is a requirement for projects with unobstructed views, for regularly occupied floor area within three times the head height. But I can't figure out, and can't find any explanation about how...

Last reply: Afogreen Build, Jul 15, 2024, 9:49 pm

Timeline to join for project team

Pilot-Credits IPpc90: Social equity within the operations and maintenance staff
posted by Christoph Weindl on Sep 25, 2020, 11:27 am

We're pursuing "Social equity within the project team" with Option 2.

Under Requirement, it’s stated that “Certifications/reporting must be publicly accessible, be created within 2 years...

Last reply: , Jul 15, 2024, 5:59 pm

LTc7- Reduce parking footprint- examplary performamce

NC-v4 LTc7: Reduced parking footprint
posted by Maria Peralta on Jul 3, 2019, 10:27 am

Hello!  

I got a question regarding the credit LTc7.The project wich I am working with, doesnt have a parking, so, at is says in the leed guide "Projects with no associated off-street...

Last reply: Thomas Lagarde, Jul 15, 2024, 3:11 pm

Breaking Down Energy Usage

EBOM-v4.1 EAp3: Energy Performance
posted by H W on Jul 15, 2024, 3:37 am

Hi All,

There is a building complex consisting of 2 office towers managed by the same property management company, which share the same chiller plant. Most of the electricity bills are...

Maximum Distance from Parking to Site

NC-v4 LTc7: Reduced parking footprint
posted by Laraib Raza on Jul 13, 2024, 3:29 am

Hello All LEED Users,My question is what is the maximum distance allowed from the building(site) to parking? If the Parking is located outside of the site boundary?