Topic | Recent |
---|---|
LEED v4 sunset date confirmation...LEED Rating System Selectionposted by Rick Alfandre on May 11, 2022, 2:08 pmhints and guidance in the forums and from GBCI as to how to do this. Log in or register to post comments ... Last reply: Kath Williams, May 11, 2022, 4:37 pm |
|
Distance to the access point within the limit or notHealthcare-v4 SSc7: Places of respiteposted by Priscillia Champagne on May 11, 2022, 4:14 pm
Hi, We have an expansion project with operating room, offices, cleaning space for the entire hospital. We would like to install a respite area for visitors (companions) and day patients of this... |
|
Bicycle Facilities- Shower requirementNC-v4 LTc6: Bicycle facilitiesposted by akshaya bhaskar on May 11, 2022, 3:28 pm
We are currently working on a park Shelter in a public park In the united states. The shelter is open for bookings to the public for fixed periods at a time. We are currently pursuing LEED BD+C.... Last reply: emily reese moody, May 11, 2022, 3:51 pm |
|
Fundamental Commissioning of On-Site Solar ArrayNC-2009 EAp1: Fundamental Commissioning of Building Energy Systemsposted by Rachel Williams on May 11, 2022, 11:02 am
I am working on a project that, through a series of contract issues during construction, does not have... Last reply: Rachel Williams, May 11, 2022, 2:17 pm |
|
Sound Rating Method- can these vary per space types?NC-v4 EQc9: Acoustic performanceposted by Iris Meeker on May 11, 2022, 2:01 pm
For HVAC Background Noise, do all spaces have to use the same Sound Rating Method (NC/RC,... |
|
Prerequisite questions for Minimum Energy Performance v4.1NC-v4.1 EAp2: Minimum Energy Performanceposted by Greenlab on May 10, 2022, 11:24 am
For the prerequisite, can we obtain it, if we only achieve improvements on one of our indicators (Cost or... Last reply: Greenlab, May 11, 2022, 4:27 am |
|
Do Recycling Rooms need to be Negatively Pressurized?NC-v4 EQc1: Enhanced indoor air quality strategiesposted by Nicole Pandolfo on Sep 21, 2017, 12:08 pm
Do recycling rooms need to be negatively pressurized to meet the requirements of Interior Cross-Contamination Prevention in LEED V4 now that recylcing rooms must include the collection of... Last reply: Christoph Keck, May 11, 2022, 4:18 am |
|
Option 3- Product Manufacturer Supply Chain OptimizationCI-v4 MRc5: Building product disclosure and optimization - material ingredientsposted by Edgar Arevalo on May 10, 2022, 4:24 pm
Has anyone been able to tackle the third option for this credit, which is not shown in the BPDO calculator? I look at the template on LEED Online for this credit, and it says for this... |
|
Existing Ice MachineCI-v4 WEp1: Indoor water use reductionposted by Michelle Rosenberger on Aug 22, 2019, 1:41 pm
The Prerequisite is pretty explicit that it only applies to newly installed fixtures. What happens if the ice machines are existing? Last reply: Michelle Rosenberger, May 10, 2022, 11:11 am |
|
PM-10 TestingNC-v4 EQc4: Indoor air quality assessmentposted by Robert Cashins on May 9, 2022, 5:02 pm
What method of testing have people used to measure airborne PM-10 dust required as part of V4 IEQ Credit 3.2? Is real time monitoring acceptable? What specific methods have been... |