Log in
Forum » Portugal
Loading...
Topic

Airport projects- LEED NC-v4: LT c4 Surrounding density and diverse uses

NC-v4 LTc4: Surrounding density and diverse uses
posted by Ricardo Sá on Sep 4, 2018, 12:08 pm

Dear All,
we are working in a project of a new airport pursuing LEED certification, and our clients asked us to perform a preliminary evaluation of the potential LEED score.
The new...

Last reply: Deborah Lucking, May 14, 2019, 4:40 pm

Refrigerated areas

NC-v4 EQc5: Thermal comfort
posted by Ricardo Sá on Apr 16, 2019, 4:45 am

Dear All,

we are evaluating the possibility of certifying a distribution center, where 85% of the area is refrigerated for product conservation (between 0 º C and 4 ºC).

In what...

Only commuter rail frequency complies with requirements

NC-v4 LTc5: Access to quality transit
posted by Ricardo Sá on Apr 15, 2019, 12:58 pm

Dear All

we are evaluating the possibility of certifying a distributrion center.

In what related LT C5 (“Access to Quality Transit”):

  1. the building is served...

LEED Certification- Buildings inside a campus

LEED Rating System Selection
posted by Ricardo Sá on Apr 10, 2019, 10:29 am

Dear All,

we were contacted to make a commercial proposal for the LEED certification of 3 interdependent buildings located in the same campus:

  • large office building;
  • ...

Airport projects- LEED NC-v4: LT c6 BICYCLE FACILITIES

NC-v4 LTc6: Bicycle facilities
posted by Ricardo Sá on Nov 13, 2018, 11:53 am

Dear All,

we are working in a project of a new airport pursuing LEED certification.

Regarding LT Bicycle facilities:

  1. peak transients are mainly passengers that are not...

Last reply: Alana Cristante, Mar 28, 2019, 2:56 pm

Core & Shell” version of the “LEED BD+C: Warehouses and Distribution Centers

LEED Rating System Selection
posted by Ricardo Sá on Mar 27, 2019, 1:20 pm

Dear...

Last reply: Michelle Rosenberger, Mar 27, 2019, 3:05 pm

Refrigerated Storage rooms ventilation requirements

NC-v4 EQp1: Minimum indoor air quality performance
posted by Luis Andrade on Feb 1, 2019, 1:12 pm

Hello,

I have a doubt regarding the need to ventilate refrigerated warehouses or storage rooms.

As per Addenda L of ASHRAE 62.1 - 2010, refrigerated strorage rooms with a cooling...

Last reply: David Hubka, Mar 21, 2019, 7:53 am

Flush-out- Hotel Facility

NC-2009 IEQc3.2: Construction IAQ management plan - before occupancy
posted by Luis Andrade on Jan 22, 2019, 3:11 pm

Hello,

I'm currently working in a project that is a hotel facility.

The HVAC system type are 100% DOAs across the project and FCUs. However I'm having a problem regarding the...

Last reply: Dylan Connelly, Mar 4, 2019, 10:02 pm

Process energy compliance

NC-v4 EAp2: Minimum Energy Performance
posted by Luis Andrade on Feb 25, 2019, 6:42 am

Helo al!

We are evaluating the LEED certification potential of a new winery that will be built in Portugal (using the rating system LEED BD+C v4: New Construction and Major Renovation)....

Last reply: Marcus Sheffer, Mar 4, 2019, 5:02 pm

LEED EB-OM- Office Building- Portugal- No Cooling Tower

Pilot-Credits WEpc94: No Cooling Tower
posted by Goreti Guedes on Feb 12, 2019, 12:26 pm

Dear all,

I have also some doubts about this Pilot Credit (No Cooling Tower):

Requirement:

''the baseline system designated for the building using ASHRAE 90.1-2010...