Log in
Forum
Topic

Distribution center, unconditioned space

NC-v4 EAp2: Minimum Energy Performance
posted by santiago sanchez on Oct 3, 2022, 5:42 pm

Good afternoon all,

We are working on a distribution center, most of the project is a merchandise warehouse with automatic systems for the movement of the merchandise, such as shuttle...

Last reply: Marcus Sheffer, Oct 7, 2022, 5:20 pm

Non-predominant condition on multifamily building

NC-v4 EAp2: Minimum Energy Performance
posted by Nicolas Martinez Ochoa on Oct 4, 2022, 4:05 pm

Hello everyone,

We have worked on several residential projects, but we want to bring back a question that has some contradicting (and confusing) answers trying to get an updated solid...

Last reply: Marcus Sheffer, Oct 7, 2022, 5:15 pm

Photocatalytic Coating

NC-v4.1 EQc2: Low-emitting materials
posted by Allen Cornett on Sep 28, 2022, 3:51 am

Are self-cleaning titanium dioxide water-based photocatalytic coatings included in the documentation for the Paints & Coatings category?

Last reply: Deborah Lucking, Oct 7, 2022, 10:55 am

Material Ingredient Reporting

CS-v4.1 MRc4: Material Ingredients
posted by Elinor Sullivan on Oct 4, 2022, 11:50 am

When I input the different material ingredient reporting certificates ie: Declare labels, HPD etc... I am then choosing whether they are 3rd party verified or not -only gives 0.5 points for 3rd...

Last reply: Elinor Sullivan, Oct 7, 2022, 10:21 am

What threshold of reverberation time to apply for Performing arts Space / ballroom?

NC-v4 EQc9: Acoustic performance
posted by Sara BENLOUBA on Oct 4, 2022, 11:49 am

Hi everybody, 

How do you set the reverberation time values ​​for "Performing Arts Space"? On table 2 of the LEED V4 guide page 758, nothing is written except "Vary by application". So...

Last reply: Sara BENLOUBA, Oct 7, 2022, 10:02 am

HOW MANY METERS

Hospitality-CI-v4.1 EAc3: Advanced Energy Metering
posted by JORDI CASTELLANO on Oct 6, 2022, 7:59 am

We are conducting a certificate LEED for a student residence.
We have a doubt regarding the meters that must be placed. We don't know if we:

1 - should put one for each room, or...

Last reply: Marcus Sheffer, Oct 7, 2022, 9:32 am

Trend of water meter and leak sensor in Japan projects

Pilot-Credits WEpc153: Water Leak Detection and Monitoring
posted by Yohei Ohashi on Oct 7, 2022, 2:52 am

I am seeking to achieve Pilot-Credits WEpc153 - Water Leak Detection and Monitoring for LEED ID+C. The Project in Japan generally is required to install a tenant level water meter and...

Parking Lots at undergraound at the basement

NC-v4 LTc7: Reduced parking footprint
posted by Stephan Zweig on Oct 5, 2022, 4:33 am

Hello,

I have following question:

If in a project there are parking lots in the building at the basement, can this project be eligible for the credit “reduced parking”?

...

Last reply: J Schütz, Oct 7, 2022, 5:19 am

Project in Europe: Do I need to upload the Loacal Permission of the Project?

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by Stephan Zweig on Oct 5, 2022, 4:26 am

Hello,

I have a project in Europe, at the leedonline platform do I need to upload for the project the  building permission of the government?

If yes, does this document need to be...

Last reply: J Schütz, Oct 7, 2022, 5:13 am

Bicycle storage & shower facilities for multiple buildings

CS-v4 LTc6: Bicycle facilities
posted by James Jin on Jul 28, 2022, 1:59 pm

Hi all,

I have a question regarding the allocation of bicycle storage spaces and shower facilities for projects with multiple buildings. A similar question has been asked before (...

Last reply: James Jin, Oct 6, 2022, 1:36 pm