MRpc103- Integrative Analysis of Building Materials

Pilot-Credits MRpc103: Integrative Analysis of Building Materials
posted by Mario Kranzl on Aug 2, 2023, 7:40 am

We were at the begining quite overwhelmed with this one. It seemed like a complicated thing to do, since the analysis went really much deeper than any of the other credit required it to. But we...

Last reply: Maegan Sweeney, Jan 12, 2024, 9:38 am

No Cooling Tower

NC-v4.1 WEc3: Optimize Process Water Use
posted by Azra Semic on Jun 14, 2023, 8:10 am

"Option 2. Optimize Water Use for Cooling" if they meet the eligibility criteria described in the Step-by-Step Guidance. In another forum on this matter titled "No Cooling Tower option...

Last reply: Brittany Garneau, Dec 19, 2023, 8:21 am

what's the definition of occupants for Hospitality?

EBOM-v4 LTc1: Alternative Transportation
posted by Ernst Schriefl on Dec 14, 2023, 10:15 am

what's the definition of occupants for Hospitality? Which identity groups belongs to occupants of Hospitality and should be surveyed? 

Parking Lots at undergraound at the basement

NC-v4 LTc7: Reduced parking footprint
posted by Stephan Zweig on Oct 5, 2022, 4:33 am

Hello,

I have following question:

If in a project there are parking lots in the building at the basement, can this project be eligible for the credit “reduced parking”?

...

Last reply: J Schütz, Oct 7, 2022, 5:19 am

BD+C MAJOR RENOVATION- How is mahor renovation defined?

LEED Rating System Selection
posted by Stephan Zweig on Oct 5, 2022, 4:29 am

Hello,

For rating system BD+C Major Renovation: How is Major Renovation Defined? Is there a proving document required to upload  to state that the existing building is under MAJOR...

OPR and BOD docunets

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by Stephan Zweig on Oct 5, 2022, 4:13 am

Hello,

at the LEED on line platform for the LEED Documentation do we need to upload the documents

Owners Project Requirements (...

Time Frame for LEED Precertification and/or Deadline to submit narratives after Preliminary Review!

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by Amjad Ali H Ahmadalshteihi on Oct 3, 2022, 3:37 am

Deal LEED fellows, 

we have receivedPrecertification Preliminary Review on 19.09.2022 from LEED and some credits are not rewarded with any points and states beside it that it is still...

validity of LEED certificate (LEED-CS v2009); necessary period of USGBC membership

Performance Period
posted by Ernst Schriefl on Oct 1, 2018, 6:42 am

We are in the process of certifying several buildings under a campus approach (LEED Master Site D+C), where each building / project is certified unter the LEED-CS v2009 rating system.

The...

Last reply: Trista Brown, Aug 10, 2022, 11:29 am

Comparison between the three systems BREEAM, DNGB LEED

LEED Rating System Selection
posted by Wisam Maddni on Mar 9, 2022, 4:03 am

Dear ladies and gentlemen,

I would like to ask this question: Are there currently properties that have several certification systems (...

Fog Installation on the rooftop

NC-v4 WEc1: Outdoor water use reduction
posted by Christoph Keck on Jan 25, 2022, 6:37 am

Hi,

our project has a fog installation on it´s rooftop.

The water consumption of said installation would be 3,6 l/min.

Under which section or what credit is this taken into...

Last reply: Paula Melton, Jan 28, 2022, 9:25 am