Comparison between the three systems BREEAM, DNGB LEEDLEED Rating System Selectionposted by Wisam Maddni on Mar 9, 2022, 4:03 am
Dear ladies and gentlemen, I would like to ask this question: Are there currently properties that have several certification systems (... |
|
Fog Installation on the rooftopNC-v4 WEc1: Outdoor water use reductionposted by Christoph Keck on Jan 25, 2022, 6:37 am
Hi, our project has a fog installation on it´s rooftop. The water consumption of said installation would be 3,6 l/min. Under which section or what credit is this taken into... Last reply: Paula Melton, Jan 28, 2022, 9:25 am |
|
Sound transmission- STC Rating- SpecifyNC-v4 EQc9: Acoustic performanceposted by Stephan Zweig on Feb 14, 2019, 5:38 am
Hello Leed User community, I am looking at the acoustic performance tool for LEED v4. At the table for Sound transmission... Last reply: Tracy Marquis, May 8, 2020, 12:51 pm |
|
LEED v4 ASHRAE 90.1 Simulation- DES Option 1, Path 3. Streamlined ModelingNC-v4 EAp2: Minimum Energy Performanceposted by Eduardo Vidal Kume on Apr 29, 2020, 7:31 am
Hi all, I Would like to use LEED v4 Reference Guide District Enery System, Option 1, Path 3 "Streamlined Modeling" for a Building that has both Disctric Heating and Cooling. The building... |
|
Credit: Grid HarmonizationLEED v4.1 Discussion Forumposted by Stephan Zweig on Jul 17, 2019, 7:08 am
Dear Leed User, I have a question about the Grid Harmonization Credit: If there is no... Last reply: Konstantina Kalliakoudi, Feb 18, 2020, 2:37 am |
|
Limits for VOC content outside US, additional questionsCS-2009 IEQc4.1: Low-emitting materials - adhesives and sealantsposted by Ernst Schriefl on Apr 17, 2019, 12:14 pm
All the limits on... |
|
Submitting a credit during the review process which was not submitted at first applicationLEED Reviews: Appeals, Design/Construction Submittals, and moreposted by Ernst Schriefl on Apr 17, 2019, 6:58 am
I have a general question regarding the review process: Say, you have already submitted a certain amount of credits for review and received a preliminary review. While some credits... Last reply: Michael Smithing, Apr 17, 2019, 11:16 am |
|
validity of LEED certificate (LEED-CS v2009); necessary period of USGBC membershipPerformance Periodposted by Ernst Schriefl on Oct 1, 2018, 6:42 am
We are in the process of certifying several buildings under a campus approach (LEED Master Site D+C), where each building / project is certified unter the LEED-CS v2009 rating system. The... Last reply: Trista Brown, Apr 11, 2019, 9:16 pm |
|
Are Parking areas for Buses and Taxis included in Option 2NC-v4 SSc5: Heat Island Reductionposted by Stephan Zweig on Feb 21, 2019, 5:46 am
Hello to all, Do you have any suggestion if I have to include for Option 2 of heat island reduction credit the following: 1) Parking lots for Buses? 2) Taxis waiting areas... Last reply: emily reese moody, Mar 12, 2019, 9:31 pm |
|
Sewage treatment plant used as alternative water sourceNC-v4 WEc2: Indoor water use reductionposted by Stephan Zweig on Feb 13, 2019, 7:15 am
Hello to all, My building uses water for the toilets and for the irrigation from a municipally sewage treatment plan with biological treatment. Does this source count as... Last reply: emily reese moody, Feb 18, 2019, 2:16 pm |