Topic | Recent |
---|---|
IN- Innovation Credit- Social Equity in the CommunityCI-v4.1 IN101: Innovationposted by Joya Bhandari on Nov 16, 2023, 11:59 pm
If a project owner has its own NGO association, can they be eligible for this credit? They work with local NGOs. Thank you! |
|
Proposed building HVAC system (ASHRAE 90.1 (2010) Table G3.1.10.b)CS-v4 EAp2: Minimum Energy Performanceposted by André Harms on Aug 10, 2023, 8:43 am18, 2023- 1:37 pm Hey Glen, I feel your pain. I was in your situation several years ago. You may have seen my post on this forum describing a similar CS situation. I learned about the signed tenant... Last reply: André Harms, Aug 29, 2023, 3:07 am |
|
how can attachments (drawings, images) be sent in a CIR?NC-v4 IPc1: Integrative processposted by Sara BENLOUBA on May 25, 2023, 4:45 am
Dear Everybody, We would like to send a... Last reply: Afogreen Build, Jun 27, 2023, 12:08 pm |
|
How contact GBCI for their advice on technical mattersNC-v4 IPc1: Integrative processposted by Sara BENLOUBA on May 24, 2023, 4:59 am
Dear everybody, Please, how do you contact... Last reply: Marcus Sheffer, May 24, 2023, 10:08 am |
|
Slab / Floor Insulation, is it mandotaryHomes-v4 EAp1: Minimum Energy Performanceposted by Omar Elrawy on Jan 6, 2023, 4:01 am
Hi, For the prerequisite requirement to add R-19 insulation to floor / slab under energystar, is it required on every floor? The... Last reply: Brett Little, May 14, 2023, 2:15 pm |
|
Group approach- Minimum requirement complianceNC-v4 EAp2: Minimum Energy Performanceposted by Luis Andrade on May 2, 2023, 12:54 pm
Hello everyone! I am working on 2 buildings that are registered in one project following the group approach. We did not report the buildings seperatly on the MEPC in the first... Last reply: Marcus Sheffer, May 3, 2023, 11:45 am |
|
Basement lobbiesNC-2009 IEQp1: Minimum indoor air quality performanceposted by Marni Punt on Apr 14, 2015, 4:48 am
We have a project with 3 lobbies located in basement parking. The lobbies are not regularly occupied spaces, but are circulation spaces connecting to the main reception and lobby on the Ground... Last reply: Andrey Kuznetsov, Apr 29, 2023, 4:07 pm |
|
Vestibules- CIR 10426- InterpretationNC-2009 EAp2: Minimum Energy Performanceposted by André Harms on Jul 1, 2016, 9:25 am
The... Last reply: Julio Fernandez Amodia, Mar 14, 2023, 4:51 pm |
|
New Construction project with warehouse and bus parkingNC-v4 LTc8: Green vehiclesposted by Dina El-Sady on Mar 5, 2023, 6:14 am
The project is a production building with a connected warehouse and small office building , the parking located within the LEED project boundary is inclusive of bus parking used for building... |
|
Voltage Drop // mandatory provisions ASHRAE 90.1- 2010- ADDENDA 10218NC-v4 EAp2: Minimum Energy Performanceposted by Sara BENLOUBA on Nov 22, 2022, 8:41 am
Hello everybody, We are working on a project under LEED V4 certification. ABOUT PREREQUISITE “MINIMUM ENERGY PERFORMANCE” , we must comply with the ASHRAE mandatory provisions and... Last reply: Tyler Thumma, Dec 16, 2022, 10:13 am |