Log in
Forum
Topic

Commingled Waste approach in storage locations for recyclable materials

EBOM-v4.1 MRp3: Waste Performance
posted by Maysoon Al-Khuraissat on Sep 20, 2022, 9:59 am

I'm working on a huge existing Mall, Is the...

Hot Gas Reheat

NC-v4 EAp2: Minimum Energy Performance
posted by Nicolas Martinez Ochoa on Sep 19, 2022, 6:49 pm

Hello everyone,

We are working on a project with dehumidification, which has a hot gas reheat to decrease the heating load after the cooling stage. 

Can I claim savings because of...

Last reply: Cory Duggin, Sep 19, 2022, 7:16 pm

LEED ID+C: Commercial Interiorsv4- LEED v4 LEED Commissioning

CI-v4 EAp1: Fundamental commissioning and verification
posted by Tamer Qsoos on Sep 19, 2022, 12:45 pm

Hi,

As LEED...

Whether to just upload the Tables of contents for Fundamental Cx documentation review?

NC-v4 EAp1: Fundamental commissioning and verification
posted by zz kelvin on Sep 19, 2022, 12:24 pm

When a document is submitted for review, is it understood that only the tables of contents  needs to be uploaded, and the detailed document content does not need to be uploaded? In addition, the...

Last reply: Dave Hubka, Sep 19, 2022, 12:40 pm

Precertification process deliverables

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by Julio Fernandez Amodia on Sep 16, 2022, 4:53 am

Hi there,

This is Julio, I am currently carrying out a LEED CS v4 certification for a shopping mall. The client is asking for a precertification, but I am unfamiliar with the process. I...

Last reply: Vanessa Montezuma Ramos, Sep 19, 2022, 11:31 am

Pilot Credit

Pilot-Credits IPpc101: Integrative process
posted by AMIR ZULKHAIRI AHMAD BANGI on Sep 19, 2022, 1:22 am

As per the requirements of the pilot credit, we are noting our participation in this forum.

LEED O+M v4 Pilot Credit Participation

Pilot-Credits IPpc101: Integrative process
posted by AMIR ZULKHAIRI AHMAD BANGI on Sep 19, 2022, 4:36 am

Hi, Amir! I think the idea behind this requirement is that you say something about your experience with the credit to help others who may be pursuing it. I doubt "We are noting our participation in this forum" is going to count as participation. Log in or register to post comments 0 Vote up! ...

Last reply: Paula Melton, Sep 19, 2022, 8:58 am

Future Solar Panels on Roof

CS-v4 SSc5: Heat Island Reduction
posted by James Jin on Sep 16, 2022, 11:55 am

Hi all,

I am working on a project with rooftop solar panels planned. A portion of the solar panels will be initially installed during building construction, and the rest will be installed...

Last reply: James Jin, Sep 16, 2022, 1:08 pm

Parking & Retail Potential for LEED O&M

EBOM-v4.1 SSc4: Site management
posted by LEED Team on Sep 16, 2022, 9:21 am

We are looking to certify a mixed use parking and retail...

Strategy 4. Filtration of Recirculated Air

CS-v4.1 EQc1: Enhanced indoor air quality strategies
posted by Alto ingénierie on Sep 16, 2022, 3:20 am

Hello!

Can we consider strategy 4 Filtration of Recirculated Air( from the credit  Enhanced Indoor Air Quality Strategies) reached by default if we have no recirculated air? ...