Topic | Recent |
---|---|
Process consumptionsWarehouses-EBOM-v4.1 EAp3: Energy Performanceposted by RICCARDO BALLESIO on May 3, 2023, 11:13 am
We are analysing the electrical energy consumption of our client. The building is a warehouse of approximately 10.000 sqm with 1000 sqm of offices. The building is provided with a photovoltaic... |
|
VentilationWarehouses-EBOM-v4.1 EQp1: Minimum Indoor Air Qualityposted by RICCARDO BALLESIO on May 3, 2023, 11:19 am
All office spaces are naturally ventilated. The minimum opening location and size requirements are satisfied for all offices, restroom and meeting rooms. In case we find some areas such as... |
|
Job Opening! Manager of High Performance and Sustainable ConstructionHelp Wanted: LEED-related Jobsposted by Susan Heinking on May 2, 2023, 1:42 pm
Looking to make a difference on the Construction side of the industry? Come join Pepper Construction! We are a midwest based... |
|
Theater lighting controlsNC-v4 EQc6: Interior lightingposted by Rafi Karim on May 1, 2023, 8:05 pm
Hi All, we are working on a higher education theater school project where the Theater/Performace spaces do not have lighitng control panel in the same space as the performance because the lights... Last reply: Douglas Flandro, May 2, 2023, 10:04 am |
|
Landscape Exterior lighting LPD Mandatory provisionsNC-v4 EAp2: Minimum Energy Performanceposted by Julio Fernandez Amodia on Apr 25, 2023, 7:27 am
Hi there, I am currently calculating the power allowance for exterior lighting in a school project. In this case, there is quite a lot of exterior spaces and landscaping. Almost one... Last reply: Neeraj Sharma, May 2, 2023, 2:34 am |
|
Entryway System Documentation- Will Photos Work?CI-v4 EQc1: Enhanced indoor air quality strategiesposted by Marie Miller on Apr 27, 2023, 9:07 pm
I'm working on a TI project and the client doesn't have access to plans of the main floor. The landlord has said that taking photos will be acceptable, but will photos work for documentation? It... Last reply: Marie Miller, May 1, 2023, 5:51 pm |
|
PRESENCE OF WATERPilot-Credits EQpc123: Designing with Nature, Biophilic Design for the Indoor Environmentposted by Ingrid Muñoz on Jan 17, 2023, 7:36 pm
Hello, we are pursuing the Designing with Nature, Biophilic Design for the Indoor Environment pilot credit for an interior commercial. Is it possible to use the following strategy as part of... Last reply: Matthieu Kieken, May 1, 2023, 11:28 am |
|
Minimum Indoor Air Quality Performance CalculationNC-2009 IEQp1: Minimum indoor air quality performanceposted by Amal Venugopal on Jul 4, 2017, 7:27 am
My Project is Having one FAHU on roof which is supplying treated Fresh air to all... Last reply: Andrey Kuznetsov, Apr 29, 2023, 4:16 pm |
|
Basement lobbiesNC-2009 IEQp1: Minimum indoor air quality performanceposted by Marni Punt on Apr 14, 2015, 4:48 am
We have a project with 3 lobbies located in basement parking. The lobbies are not regularly occupied spaces, but are circulation spaces connecting to the main reception and lobby on the Ground... Last reply: Andrey Kuznetsov, Apr 29, 2023, 4:07 pm |
|
Structure and enclosureNC-v4 MRc2: Building product disclosure and optimization - environmental product declarationsposted by Noriko Nagazumi on Aug 24, 2016, 8:49 pmelements. I am curious how others have handled materials like these. Since the questions above are applicable to all BPDO Credits, I have posted them to the “Sourcing of Raw Materials” forum. Let’s continue... Last reply: Nove Sol, Apr 29, 2023, 9:15 am |