Topic | Recent |
---|---|
Which buildings/structures to consider while registering projectEBOM-v4.1 MPR2: Must use reasonable LEED boundariesposted by Wafa Arif on Sep 11, 2023, 4:28 am
I have three office towers on one large property, each connected to a mall via walkways. The shared parking structures beneath these towers serve tenants, mall visitors, and others. My objective... |
|
Basement carpark areas?CS-2009 IEQc4.1: Low-emitting materials - adhesives and sealantsposted by Scott McMillan on Jul 2, 2015, 11:54 pm
As noted above the requirement is applicable to "All adhesives and... Last reply: Ahmed Ashraf Abdelfattah, Sep 11, 2023, 3:00 am |
|
DES Owned by A Third PartyNC-v4 EAp4: Fundamental Refrigerant Managementposted by Candice Rogers on Sep 8, 2023, 12:03 pm
Hello - We have a project pursuing certification that is served by a... Last reply: Candice Rogers, Sep 9, 2023, 2:55 pm |
|
Waste-to-Energy diversionNC-v4.1 MRp2: Construction and demolition waste managementposted by Danielle Waters on Sep 7, 2023, 1:04 pm
In LEED v4,... Last reply: Dave Hubka, Sep 7, 2023, 2:17 pm |
|
Definitions for a lab/office buildingNC-v4 LTc7: Reduced parking footprintposted by Maiz Rech on Sep 7, 2023, 9:56 am
Hello! I'm working on a lab/office building (3800 sq meters, 1 office floor and 2 lab floors). The building will be used only by the company that owns it, the lab and offices won't be... |
|
TABLE 1. Default Occupancy NumbersCS-v4 EQp1: Minimum indoor air quality performanceposted by Oscar Martinez on Sep 6, 2023, 12:05 am
Hi, I'm working on a warehouse project in Mexico. The rating system is v4 CS and I have a question in progress. In the storage area, we are considering the table APPENDIX 2. DEFAULT... |
|
Advanced metering for cooling and ventilationNC-v4 EAc3: Advanced Energy Meteringposted by Dina El-Sady on Sep 6, 2023, 5:50 am
How can we separate metering for cooling an ventilation if they are both within the same unit ? Last reply: Dave Hubka, Sep 6, 2023, 9:17 am |
|
Engineered Natural Ventilation or Mechanical VentilationNC-v4.1 EQp1: Minimum indoor air quality performanceposted by Paola Moschini on Aug 24, 2023, 10:27 am
Dear all, we are working on a student residence in which every room is equipped with a façade-mounted trickle vent, allowing for the entrance of outdoor air at a rate of 40 m3/hour which is... Last reply: Julian Bork, Sep 6, 2023, 7:24 am |
|
Menstrual product dispensorsPilot-Credits WEpc147: All-Gender Restroomsposted by Emily Smith on Sep 5, 2023, 3:22 pm
The biggest hurdle we faced integrating this credit into our project was the requirement regarding providing free menstrual products. Initially, we were told that the dispensors would cost an... |
|
Rainwater ManagementNC-v4 SSc4: Rainwater managementposted by Ribert Senzoga on Sep 5, 2023, 12:52 pm
I am evaluating the Rainwater Management of a warehouse project where the water table is very high and we don't have enough depth to make a water basin. Does LEED have any suggestion to deal with... |