LEED v4.1 O+M, Energy and Atmosphere- Energy Performance- Arc Platform- CHPEBOM-v4.1 EAp3: Energy Performanceposted by Flotra Stamm on Dec 20, 2023, 6:44 am
We have a question regarding filling out the data information in ARC platform for a... |
|
Flush-out of a Modular BuildingNC-v4.1 EQc4: Indoor air quality assessmentposted by Neil Rosen on Dec 19, 2023, 4:01 pm
If I am fabricating the building off-site in modules and assembling those modules on-site, can I perform the flush-out in the factory? Last reply: Dave Hubka, Dec 19, 2023, 5:47 pm |
|
Test and balanceNC-v4 EAc1: Enhanced Commissioningposted by Heather Holdridge on Jun 4, 2021, 2:43 pm
I understand that there were not any requirements regarding TAB in LEED 2009 -- is this still true for v4? Just want to confirm that there are no issues with having the balancer contracted under... Last reply: Dave Hubka, Dec 19, 2023, 5:33 pm |
|
UPS rooms for LEEDCS-v4 EAp2: Minimum Energy Performanceposted by Rajat Wadhwa on Dec 19, 2023, 12:17 pm
Hi, I am working on a Data Center and I am confused if we should model UPS rooms for LEED and what schedule should I use since its a backup supply room incase the power goes . TIA... Last reply: Marcus Sheffer, Dec 19, 2023, 3:13 pm |
|
UPS rooms for LEEDNC-2009 EAp2: Minimum Energy Performanceposted by Rajat Wadhwa on Dec 19, 2023, 11:57 amMarcus Sheffer LEED Fellow 7group / Energy Opportunities LEEDuser Expert 5903 thumbs up December 19, 2023- 12:19 pm LEED 2009 projects have sunset. Are you still working on one? If not then please post your question to the v4 or v4.1 forum. In general backup power systems do not get modeled. Log in or register to post comments ... Last reply: Marcus Sheffer, Dec 19, 2023, 12:19 pm |
|
Modeling UPS Room for Data CenterNC-2009 EAp2: Minimum Energy Performanceposted by Rajat Wadhwa on Dec 19, 2023, 11:50 amMarcus Sheffer LEED Fellow 7group / Energy Opportunities LEEDuser Expert 5903 thumbs up December 19, 2023- 12:06 pm LEED 2009 has sunset. Are you still working on a 2009 project? If not then please post this in the v4 or v4.1 forum. In general back up power systems do not get modeled. Log in or register to post comments Rajat Wadhwa LEEDuser Basic Member December 19, 2023- 12:15 pm Sorry its V4,... Last reply: Marcus Sheffer, Dec 19, 2023, 12:16 pm |
|
Option 1: Climate Related Risk Management Planning StepPilot-Credits IPpc98: Assessment and planning for resilienceposted by Marina Rullo on Oct 27, 2023, 1:04 pm
Our firm pursued this credit for a project site in Baltimore, MD. I found that the prerequisite and Option 1 overlap a great deal, especially when they are presented in the same worksheet. In the... Last reply: Lisa Bolle, Dec 19, 2023, 11:22 am |
|
No Cooling TowerNC-v4.1 WEc3: Optimize Process Water Useposted by Azra on Jun 14, 2023, 8:10 am"Option 2. Optimize Water Use for Cooling" if they meet the eligibility criteria described in the Step-by-Step Guidance. In another forum on this matter titled "No Cooling Tower option... Last reply: Brittany Garneau, Dec 19, 2023, 8:21 am |
|
How to justify that a parking garage is ventilated enough?EBOM-v4 EQp1: Minimum indoor air quality performanceposted by Joan Mora Juvanteny on Dec 19, 2023, 7:46 am
Hello, We have some problems to justify that an exterior parking with a covered part meets the Table 6.5 minimum exhaust requirements. The covered part is one-side opened so we can't apply... |
|
Optimize Process Water Use, Option 2 with ASHRAE 90.1 2010 model?NC-v4.1 WEc3: Optimize Process Water Useposted by Deb Favaretto on Nov 9, 2021, 2:37 pm
We are submitting a LEED v4 BD+C NC project with LEED v4.1 upgrades on a credit-by-credit basis. Minimum and Optimize Energy Performance have remained v4. We are interested in pursuing the v4.1... Last reply: Brittany Garneau, Dec 19, 2023, 8:06 am |