We are submitting a LEED v4 BD+C NC project with LEED v4.1 upgrades on a credit-by-credit basis. Minimum and Optimize Energy Performance have remained v4. We are interested in pursuing the v4.1 WE – Optimize Process Water Use credit via Option 2 methodology of comparing to a baseline model, however, we have modeled the building under ASHRAE 90.1 2010 Standard. Are we eligible for credit achievement using the ASHRAE 90.1 2010 model, in lieu of creating a second model (modeled to ASHRAE 90.1 2016) solely for the purposes of credit achievement?