Topic | Recent |
---|---|
Existing Building or Commercial interior?LEED Rating System Selectionposted by Ammar Yahia on Jul 31, 2024, 4:53 am
We have an existing 45 Storey building consist of 2 basements, ground, two mezzanine, and 40 floors. since the owner tendered a renovation & Maintenace work, replacing all the MEP... Last reply: Kara Strong, Aug 1, 2024, 11:18 am |
|
"with errata but without addenda"NC-v4 EAp2: Minimum Energy Performanceposted by Alfonzo Collins on Nov 7, 2018, 10:58 am
The LEED v3 reference book already refers to ASHRAE 90.1 "with errata but without addenda." The v4 book only says "with errata." Does that imply that all addenda to ASHRAE 90.1 must be followed... Last reply: Bipin Karki, Aug 1, 2024, 10:41 am |
|
Best replicating natural site hydrology processesNC-v4.1 SSc4: Rainwater managementposted by Allen Cornett on Aug 4, 2021, 5:40 am
If the rainwater that is captured and used for flush fixtures meets the percentile thresholds can this credit be successfully attemtped? If the rainwater is used for the flush fixtures it would... Last reply: Alexander Postnov, Aug 1, 2024, 4:40 am |
|
Single LEED building in Zoo: Demand Response Plan required for entire Zoo?NC-v4 EAc4: Demand responseposted by Joyce Kelly on Jul 31, 2024, 4:53 pm
Wondering if the... Last reply: Marcus Sheffer, Jul 31, 2024, 5:26 pm |
|
Energy Star Commercial WasherNC-v4.1 WEp2: Indoor water use reductionposted by Michael Mantai on Nov 20, 2019, 6:32 pmI successfully followed this guidance and simply excluded larger washers: https://leeduser.buildinggreen.com/forum/industrial-washer-vs-commercial... I submitted a project for review (v4, not v4.1) a couple... Last reply: Emily Purcell, Jul 30, 2024, 5:30 pm |
|
Select Different Options for Multi-Tenant Buildings?EBOM-v4.1 MRc1: Purchasingposted by Kristina K on Jul 30, 2024, 2:12 pm
Hello, Can different options be selected under this credit if there are multiple tenants in the building? (i.e., one tenant complies with the electronic equipment option, the other... |
|
Composite wood- Compliance with CARB ATCM or TSCA Title VI is not enough?NC-v4.1 EQc2: Low-emitting materialsposted by Michael on Jul 8, 2024, 1:08 am
Hi LEED experts, My project used composite... Last reply: Kristi Ennis, Jul 29, 2024, 5:16 pm |
|
Social Equity within the Project Team (Option 1)Pilot-Credits IPpc90: Social equity within the operations and maintenance staffposted by Atlas Turner on Mar 17, 2023, 4:35 pmthe Forum button, I get an "Access Denied You are not authorized to access this page" message. Log in or register to post comments ... Last reply: Renee Shirey, Jul 29, 2024, 2:51 pm |
|
Including space in the the project boundary where only one trade is included in scopeCI-v4 MPR2: Must use reasonable LEED boundariesposted by Edgar Arevalo on Jul 29, 2024, 2:07 pm
I have an ID+C project that takes up approximately half of a floor in a building. When laying out the LEED project boundary, I was confused as to whether to include the restrooms, since it was... |
|
Waste-to-Energy ClarificationNC-v4 MRc5: Construction and demolition waste managementposted by Jenni Huynh on Dec 12, 2022, 10:58 am
Hi folks, I had inquired about... Last reply: Dave Hubka, Jul 29, 2024, 1:28 pm |