Topic | Recent |
---|---|
Swimming Pools Baseline DefinitionNC-v4 EAp2: Minimum Energy Performanceposted by Ricardo Sá on Feb 6, 2020, 4:57 am
Dear All, we're currently certifying an hotel facility that includes indoor heated pools. In what relates to energy modeling, I have several questions I would like to see clarified... Last reply: Marcus Sheffer, Dec 23, 2024, 10:08 am |
|
Resources after precertificationGeneral forumsposted by Gabriela Hernández Castillo on Jul 5, 2012, 1:55 pm
Does anybody know if there is any resources page on the... Last reply: Golam Rahman , Dec 23, 2024, 1:30 am |
|
Letter from owner committing to sharing water usage dataNC-v4.1 WEp2: Indoor water use reductionposted by Mary Holland on Sep 30, 2023, 2:11 am
What language is LEED looking for in this letter? Last reply: Ben Roush, Dec 21, 2024, 1:56 pm |
|
Help needed with ARC platformEBOM-v4 MPR1: Must be in a permanent location on existing landposted by Antonio de Sousa Filho on Dec 17, 2024, 1:35 pm
Hi everyone, I’m working on an existing building re-certification in Calgary AB, and have already uploaded some documents to the ARC platform. According to the instructions, the score... Last reply: Jeff Benavides, Dec 19, 2024, 2:58 pm |
|
Total annual energy consumption in complex railway station in IndiaNC-v4 EAp2: Minimum Energy Performanceposted by Anurag Ghosh on Dec 19, 2024, 12:11 am
The railway station has one entry building which is connecting by foot over bridge with platforms. It is having AC areas majorly in station enrty building which is very less (4-5%) of total... Last reply: Marcus Sheffer, Dec 19, 2024, 12:58 pm |
|
Requirements for visitors countingPilot-Credits LTpc134: Advanced Transportation Monitoring Systemsposted by Adriana Hansen on Dec 19, 2024, 10:58 am
Hi everyone, Regarding visitors counting, is it necessary to count visitors who only stay in lobbies and outside areas, but does not entry the building? |
|
Does it have to be EXISTING infrastructure?ND-Plan-v4 SLLp1: Smart locationposted by Jeanne Davidson on Dec 19, 2024, 6:45 am
For this pre-requisite, we are developing a materplan where the buildings will be compliant with Option 4 once they are built. But they are not there yet and we are in the middle of a desert. Can... |
|
LEED boundary for a railway stationNC-2009 PIf1: Minimum Program Requirementsposted by Juan Sergio Simborio on Feb 28, 2015, 9:12 am
LEED NC 2009 Our project is a major railway station in Qatar. The shape of the... Last reply: Anurag Ghosh, Dec 18, 2024, 11:28 pm |
|
Recommened software for doing the Interior and Daylighting analyses.NC-v4 EQc7: Daylightposted by Jorng-ren Chern on Apr 10, 2018, 2:05 amin the Forum. Default Revit materials are a very good start, but when you want to define very specific glazing performance, please refer to the Forum post here: https://forums.autodesk.com/t5/lighting-solar-analysis-forum/critical-up... Log in or register to post comments Zahra Mirian LEEDuser Basic Member July 24, 2019- 4:53 pm Thanks for your response David, I have the latest version of Insight on my Revit 2019. I have cleaned up... Last reply: Caleb Crawford, Dec 18, 2024, 4:27 pm |
|
STC requirement for a Retail area next to a hallway in a medical buildingNC-v4 EQc9: Acoustic performanceposted by Todd Bundren on Dec 18, 2024, 4:04 pm
We are working on a new medical buidling (cancer center) and there is a gift shop off a large corridor close to the main entry. The owner wants the wall between the gift shop and the large... |