3953 search results for "zero lot line"

Forum
Topic

Does this credit only apply to lighting fixtures installed on masts with mounting heights?

NC-v4 SSc6: Light Pollution Reduction
posted by Sara BENLOUBA on Nov 27, 2023, 8:16 am

to post comments Sara BENLOUBA Green building manager Confidential LEEDuser Basic Member 12 thumbs up November 27, 2023- 9:49 am Dear Glenn,  Thanks a lot for your answer.  Log in or register to post...

Last reply: Devendra Chaughule, Nov 29, 2023, 12:40 am

Building Entrance Vestibule Requirements

NC-v4 EAp2: Minimum Energy Performance
posted by Christopher Russell-King on Jun 12, 2023, 12:36 pm

for workers only from the parking lot and the ground floor are building entrances that should comply. The terrace doors are not building entrances. The definition- "building entrance: any doorway, set...

Last reply: Marcus Sheffer, Nov 27, 2023, 11:53 am

Can decorative lighting be excluded from interior lighting requirements?

NC-v4.1 EQc6: Interior lighting
posted by Sara BENLOUBA on Nov 23, 2023, 8:36 am

Basic Member 12 thumbs up November 27, 2023- 9:03 am Dear glenn Heinmiller,  Thanks a lot. Your opinion is very clear.  Suppliers say it hard to find luminaires with CRI>90 that can be integrated...

Last reply: Sara BENLOUBA, Nov 27, 2023, 9:03 am

tenants meters data collection requirement

CS-v4 EAc3: Advanced Energy Metering
posted by Ricardo Sá on Dec 21, 2017, 10:52 am

costs is probably the most effective way to induce energy control behaviors)? Or do you think we will need to install an additional meter (in the same power line of the supplier meter) and connect...

Last reply: Julio Fernandez Amodia, Nov 22, 2023, 5:39 am

CO sensors for residential and duplex units?

NC-v4 EQp1: Minimum indoor air quality performance
posted by Alokmay Behera on Nov 20, 2023, 8:37 am

We have a mixed project with residential and office units. Residential area has apartments and few (12) duplex units. As per LEED requirement for Prerequisite 1- Minimum IA performance, CO sensors have to be provided for all residential units even if the cooking or any associated combusion are electric based. As the project has 12 duplexes do we need to provide 12 CO sensor units or more. As per the credit language, " CO monitors must be installed on each floor of each unit ", does that make 12X2 CO sensors for the 12 duplexes?  As the duplexes will have kitchens in the zero floor while...

Last reply: Dave Hubka, Nov 20, 2023, 8:44 am

Materials Cost- Materials and Resource Calculator

CI-2009 MRc4: Recycled Content
posted by Ricardo Sá on Jul 12, 2012, 12:56 pm

Member 84 thumbs up July 17, 2012- 1:13 pm Dear Susan, first of all let me thank you for your answer. I agree with every single line that you wrote and I can confirm that in the preliminary review...

Last reply: John Smith, Nov 20, 2023, 12:16 am

Islamic Water Closets

EBOM-2009 WEp1: Minimum Indoor Plumbing Fixture and Fitting Efficiency
posted by Jutta Berns on Jun 5, 2011, 1:44 pm

a fixture should be counted and there are a lot of conversations on how to account for various different populations in the other WE forums so I won't repeat that conversation. The foot baths I would...

Last reply: Umesh Atre, Nov 16, 2023, 11:09 am

Weekend trips

NC-v4.1 LTc5: Access to quality transit
posted by Aaron Kennedy on Apr 13, 2021, 5:11 pm

demonstrate that the building is intended to have zero weekend occupancy (including custodial / maintenance / security staff). To review an exception, the project team would need to provide a narrative...

Last reply: Azra Semic, Nov 15, 2023, 8:01 am

Mandatory envelope thermal properties

CS-2009 EAp2: Minimum Energy Performance
posted by Katherine Ann Resurreccion on Feb 14, 2012, 4:24 am

well, thanks a lot for your immediate response Marcus! Log in or register to post comments Marcus Sheffer LEED Fellow 7group / Energy Opportunities LEEDuser Expert 5867 thumbs up February 15, 2012- 9:59...

Last reply: Gustavo De las Heras Izquierdo, Nov 14, 2023, 7:16 pm

Equations and calc methods

EBOM-v4.1 EAp3: Energy Performance
posted by Ricardo Filho on Feb 21, 2023, 5:01 am

I am doing some research on LEED v4.1 O+M and I have a number of questions. I am going to post them here (I know it is a lot) hoping someone knows the answer for a few of them, maybe. thanks!! a)    How do we calculate the gross floor area without ARC? b)    How do we calculate  Weighted occupancy  ? could not find example calculation anywhere c)     How do we calculate  Weighted operating hours? could not find example calculation anywhere d)    How do we calculate  outside temperature adjustment factor? could not find example calculation anywhere e)    Where can I find the Table 2. Operating...

Last reply: Saba Hajizadeh, Nov 10, 2023, 4:29 pm