Log in

4037 search results for "zero lot line"

Forum
Topic

LEED v4.1 makes changes for commingled waste in Option 1- What do you think?

NC-v4 MRc5: Construction and demolition waste management
posted by RETIRED on Jan 23, 2019, 3:21 pm

2 increase to 7.5lbs / SF may actually be more beneficial, particularly for CI projects that don't have a lot of demo. We'll have to do some analysis. I'll be interested to hear what others...

Last reply: Tiffany Beffel, Apr 5, 2020, 12:42 pm

Indoor Water Use Calculator malfunction

NC-v4 WEp2: Indoor water use reduction
posted by Susan Di Giulio on Jan 25, 2022, 3:03 pm

write that? Really unacceptable. Clients giving us and the program a whole lot of side-eye. Again and again, it feels like the USGBC just doesn't care about it's users. Log in or register...

Last reply: Gwenedd Murray, Jul 28, 2023, 6:03 pm

How do we show compliance with CEN standards in IEQp1?

General forums
posted by Maria Porter on Feb 20, 2012, 7:34 am

Susann Geithner Principal Emerald Built Environments LEEDuser Basic Member 1297 thumbs up March 14, 2012- 2:58 pm You will probably be one of the first to try this. Have you looked at the LEED Online forms for ACPs in regards to what's required? I know that the USGBC is working really hard to give you all more guidance in that regards. I have done a lot of projects in Europe and dealt...

Last reply: Eric Johnson, Jun 4, 2012, 10:09 am

With Specialty expired

General forums
posted by Bill Swanson on Nov 2, 2012, 4:21 pm

I've never used. My career took me in a different direction into technical sales/consulting in a number of technical fields. I care a lot about LEED. In less than twelve months I have far exceeded the 30...

Last reply: Larry Sims, Jul 4, 2013, 11:41 pm

IEQc8.1- Daylighting

NC-2009 IEQc8.1: Daylight and views - daylight
posted by Mike Stopka on Aug 1, 2012, 4:38 pm

a smaller opening into the exterior ROS. In other words, you must be able to draw an unobstructed line from every point on the floor to the exterior window. Also, if your space farthest from the exterior window is more narrow than your space next to the window, you will want to draw a line perpendicular to the window from each wall perpendicular to the window to define the width of each " bay "....

Last reply: Jill Perry, PE, Sep 21, 2012, 1:21 pm

Ceramic Tile Again

NC-2009 IEQc4.3: Low-emitting materials - flooring systems
posted by Panupant Phapant on Sep 17, 2012, 4:42 am

For example, consider the issue of crystilline silica or pulverized sand which is in a lot of building products, usually over 1%. The reason that is listed for silica is the danger of cancer due to inhaling fine...

Last reply: Edgar Arevalo, Apr 24, 2024, 1:49 pm

Exemplary Performance, Point 2

NC-2009 IEQc8.2: Daylight and views - views
posted by Sara Zoumbaris on Apr 30, 2013, 12:58 pm

I've succeeded, yet. You should base the evaluation on the line of sight at 42". Refer to EQc8.1, Figure 1, of the LEED Reference Guide. Get a copy of the detailed report referred to in the LEED...

Last reply: TODD REED, Aug 5, 2013, 3:37 pm

shower in adjacent existing building

NC-2009 SSc4.2: Alternative transportation - bicycle storage and changing rooms
posted by Lyle Axelarris on Mar 4, 2016, 5:36 pm

in the neighboring building. Those showerheads could, worst case, be replaced for not that much money. (Home Depot sells the Delta 1.5 gpm showerhead for less than $10 each...) or even in-line flow reducers could...

Last reply: Sara Goenner Curlee, Dec 22, 2016, 9:57 am

Are you using Environmental Materials Reporting Forms for the contractors?

NC-v4 MRc2: Building product disclosure and optimization - environmental product declarations
posted by Courtney Royal on Oct 28, 2020, 2:05 pm

Michelle Rosenberger Partner ArchEcology LEEDuser Premium Member 523 thumbs up October 28, 2020- 2:44 pm Hi Courtney, I'll bet you get lots of answers to this one. It's been a significant...

Last reply: Stephanie Gowing, Mar 27, 2024, 10:43 am

USGBC Overhauls Demand Response Pilot- in Response to Critics

Pilot-Credits EApc8: Demand response
posted by Tristan Roberts on Jun 28, 2011, 5:33 am

generation is dirty. On-site generation uses 1/3rd the power of grid connected energy, based on how the energy analysis treats it: transmission line loses. Log in or register to post comments brendan owens svp...

Last reply: Daniel Whittet, Mar 22, 2013, 11:10 am