4027 search results for "zero lot line"
Topic | Recent |
---|---|
MR Credit: Waste PerformanceLEED v5 O&M Existing Buildings Public Commentsposted by Anna Dengler on May 24, 2024, 12:26 pmI don't think a zero waste audit would be considered a valid form of methodology for Option 1. That discourages applicants to focus on contamination because often times volume calcs and hauler reports... Last reply: Anna Dengler, May 24, 2024, 12:28 pm |
|
Overall Credit Weights in LEED v5LEED v5 BD+C/ID+C: Overall and Appendix Public Commentsposted by Jamy Bacchus on May 24, 2024, 8:11 pmin CNT's methodology to the home and the work location. That double counting is also present in LEED Zero Carbon's commuter survey form. What we do know is that average car lifetimes have been continually... Last reply: Jamy Bacchus, May 25, 2024, 6:06 pm |
|
Roof or nonroof surfaceNC-v4 SSc5: Heat Island Reductionposted by Glykeria Kourkouta on Jul 24, 2024, 9:10 amAn exterior ground area (level zero) above underground parking garage (level-1) is considered nonroof surface? If the underground space (level-1) is regularly occupied (e.g. a conference room), does the above exterior ground area (level zero) qualify as roof? Thank you in advance! SSc5 Europe – Southern ... Last reply: emily reese moody, Sep 2, 2024, 2:05 pm |
|
Renewable Energy- Tier 3- GHG equivalentsCI-v4.1 EAp2: Minimum Energy Performanceposted by Luis Andrade on Jul 26, 2024, 1:18 pmmy contract (100% renewable energy supply) and decrease to "0" (zero) those convertion factors. 2) if so, may I apply thagt only to the Proposed Design? Or I have to apply the "0 kg.... Last reply: Marcus Sheffer, Aug 2, 2024, 5:38 pm |
|
Recycled content for different concrete mixesNC-v4.1 MRc3: Sourcing of Raw Materialsposted by Saif Ahmed Mohammed on Aug 21, 2024, 1:10 pmLaura Soma Sustainability Manager GLY Construction, Inc LEEDuser Premium Member 3 thumbs up August 21, 2024- 1:18 pm In my region, different mix designs tend to have different recyclabled content values so I list each mix design on a separate line item. Additionally, I always request an EPD for each different mix design. Some ready mix suppliers have agreements in place with EPD producers or can create them through the NRMCA. Log in or register to post comments ... Last reply: Laura Soma, Aug 21, 2024, 1:18 pm |
|
Determine Number of Tests / Sampling ProtocolNC-v4 EQc4: Indoor air quality assessmentposted by Kelsey Wotila on Sep 9, 2024, 4:24 pmRuss Pellegrino Technical Director Centek Laboratories, LLC LEEDuser Basic Member 16 thumbs up September 12, 2024- 8:04 am Kelsey, Is this a what criteria are you following LEED 3.2, V4, 4.1. There are still a lot dorms following the LEED 3.2 criteria... Log in or register to post comments ... Last reply: Russ Pellegrino, Sep 12, 2024, 8:04 am |
|
Exclusion of Swimming pool Water/Energy consumption from main building consumptionEBOM-v4.1 WEc1: Water Performanceposted by P Kumar on Sep 25, 2024, 1:45 pmAndrey Kuznetsov ESG consultant, LEED AP BD+C Self Employed LEEDuser Basic Member 33 thumbs up October 24, 2024- 6:11 am Interesting issue. ASAIK it must be included and modeled the same at baseline and proposed buildings, otherwise you haven't filed apropriate explanation why it's more efficient in proposed building (for instance- reheating of pool whater from chiller hot line). Log in or register to post comments ... Last reply: Andrey Kuznetsov, Oct 24, 2024, 6:11 am |
|
luminaire mounting and partially enclosed spacesNC-v4 SSc6: Light Pollution Reductionposted by Esteban Martinez on Sep 25, 2024, 5:32 pmheight would be zero or if it would be the distance from level zero to level 2 where the luminaire is located. 2. The top floor of the project is a walkable terrace called open space, but it has a pergola... Last reply: Glenn Heinmiller, Sep 25, 2024, 5:51 pm |
|
Medical space types not listed in the Minimum IAQ Performance CalculatorHealthcare-v4 EQp1: Minimum indoor air quality performanceposted by Edgar Arevalo on Oct 18, 2024, 3:16 pmI am currently working on a LEED v4 Healthcare project, and the Minimum IAQ Performance calculator does not have space types that would be typical for a medical center or hospital. I feel we can pick a space type from the original list that best matches with the space types in the hospital, but I feel like a lot of the space types in the hospital may not match at all with any of the given spaces types in the calculator. Has anyone had the same issues with their calculators? EQp1 United States ... Last reply: Cory Duggin, Oct 18, 2024, 3:20 pm |
|
Manufacturer Documentation- a myth?Healthcare-v4.1 MRc6: PBT Source Reduction - Lead, Cadmium, and Copperposted by Rachel Steffen on Nov 5, 2024, 9:53 amcontent of 300 ppm," which could imply there is some content between zero and 300 ppm." MRc6 ... Last reply: Rachel David, Nov 26, 2024, 2:48 pm |