The year of meteringEBOM-v4 EAp2: Minimum Energy Performanceposted by Vindio Corro on Nov 20, 2014, 10:40 am
Must be the year of metering after the registration of the project or can be used a year of metering of before? Last reply: Edward Malesevich, Jan 5, 2015, 2:59 pm |
|
Shared building electricity meterEBOM-v4 EAp2: Minimum Energy Performanceposted by LEED Pro Consultant on Jan 5, 2015, 2:53 pm
We have a building which shares electricity meter with an adjacent building, only one building will be intended for certification, it is possible to identify the percentage of consumption in... Last reply: LEED Pro Consultant, Jul 2, 2015, 4:39 pm |
|
Professional EngineerEBOM-v4 EAp2: Minimum Energy Performanceposted by Charalampos Giannikopoulos on Jul 30, 2015, 8:30 am
To comply with the prerequisite is it essential to engage a Professional Engineer if the project is located outside the U.S. and consequently ineligible for Energy Star certification? Last reply: Suzanne Painter-Supplee, LEED AP+ID&C, Aug 12, 2015, 12:27 pm |
|
Case 2, Option 2 clarification- yearsEBOM-v4 EAp2: Minimum Energy Performanceposted by Alexa Stone on Jul 21, 2014, 1:56 pm
The reference guide refers to comparing site energy data for the previous 12 months with data from the 3 contiguous yrs of previous 5 yrs (in order to demo 25% improvement). Does 3 of the last 5... Last reply: Edward Malesevich, Sep 16, 2015, 10:56 am |
|
Compliance paths for estar eligible buildings with scoresEBOM-v4 EAp2: Minimum Energy Performanceposted by Alexa Stone on Jul 21, 2014, 1:52 pm
We have a building that is an ENERGY STAR-eligible building type but has a score that is less than 75 and unable to achieve 75. Using Case 1 it would not qualify. However, the building is able to... Last reply: Edward Malesevich, Sep 16, 2015, 11:07 am |
|
Sub-mertersEBOM-v4 EAp2: Minimum Energy Performanceposted by Ann-Judith Belanger on Sep 2, 2015, 1:33 pm
Hi, we have a building that share some mechanical equipment with the adjacent building. We have a meter that measures the electricity of our building but the water tower consumption is included... Last reply: Ben Stanley, Sep 24, 2015, 1:33 pm |
|
EA Prerequisite Minimum Energy PerformanceEBOM-v4 EAp2: Minimum Energy Performanceposted by Jordan Kirrane on Jan 15, 2016, 11:50 am
I'm currently completing the form for the above prerequisite to achieve the credit for EA Credit Optimize Energy Performance under Case 2, Option 2. Benchmark against historical data (0-14 points... Last reply: Ben Stanley, Mar 29, 2016, 12:00 pm |
|
Minimum Energy PerformanceEBOM-v4 EAp2: Minimum Energy Performanceposted by Aqrab Ali Rana on Jan 22, 2016, 12:29 am
Dear All, I am working on a industrial project registered in Existing building Operation and maintenance located Out of US , that have its own electricity production of 4 Mw through gas... Last reply: Dave Hubka, Jun 30, 2016, 3:52 pm |
|
Alternative Path for the Optimize Energry PerformanceEBOM-v4 EAp2: Minimum Energy Performanceposted by Meier Corporate Account on Jul 6, 2016, 4:15 pm
We are a brand new dairy located in Ohio. We were constructed in 2014 and went online in 2015. In 2014 there were only 3 new dairies built. (2015 there were only 2). As a manufacturing... Last reply: Dave Hubka, Jul 6, 2016, 4:28 pm |
|
NormalizaitonEBOM-v4 EAp2: Minimum Energy Performanceposted by Aqrab Ali Rana on Aug 5, 2016, 3:37 am
. |