OPR and BOD

NC-v4 IPc1:Integrative process
posted by  Nolberto Lopez  on 

Hi. I am studying for my LEED Green Associate exam based on LEED V4. Can someone tell me in which site I could get an example of OPR and BOD for rating system NC? Thanks.

8
Mechanical Designer
Integral Group
LEEDuser Basic Member
13 thumbs up
Tue Mar 26, 2019, 10:02 am

Double skin facade

NC-v4 EAp2:Minimum energy performance
posted by  Sarah Leenknegt  on 

Hi

How do I model a naturally ventilated double skin facade in proposed and baseline building?

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Mar 26, 2019, 7:21 am

Laminating and Contact Adhesives - Shop Applied - in v4

NC-v4 EQc2:Low emitting materials
posted by  Landry Watson  on 

I've scrolled, searched and reviewed the comments here on the thread and I'm still not clear on whether Laminating/Contact adhesives used for bonding laminates to substrates for shop assembled mill

10
Tue Mar 26, 2019, 12:55 am

Documenting Controller Efficiency

NC-2009 WEc1:Water Efficient Landscaping
posted by  Michael Hill  on 

In order to document controller efficiency will it be necessary for the landscape architect to calculate it or would it be acceptable to provide case studies such as those found at http://www.rainb

8
Tue Mar 26, 2019, 12:34 am

Legal Wood - Pilot Credit LEEDv4

NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials
posted by  Sophie Kerr  on 

If I have SFI products that make up 100% of my wood products, 25+% of my total materials, and have I completed the survey, have I met the pilot credit?

7
Default Avatar
President
Solterre Inc.
LEEDuser Premium Member
47 thumbs up
Tue Mar 26, 2019, 12:06 am

Tree distance for Tree-lined (v4)

ND-Plan-v4 NPDc14:Tree-lined and shaded streetscapes
posted by  Nuttanee Vongveeranonchai  on 

Regarding Ref Guide (p.291) in tree-lined step-by-step guidance, it says the distance between tree truck to the center of the next tree trunk shouldn't exceed than 50 feet (12 met

3
Mon Mar 25, 2019, 5:24 pm

Interior lighting in dwelling units

CS-2009 EAp2:Minimum Energy Performance
posted by  Ashish Nautiyal  on 
Hello All, I got the following comment from the LEED reviewer. Based on the Energy Simulation Report (Annexure-1), it appears that interior lighting savings are being taken for credit in the apartme
1
Mon Mar 25, 2019, 6:09 pm

Baseline Example

Pilot-Credits IPpc93:Prevention through Design
posted by  Logan McNeil  on 

Our project (UCSF Block 33, SF CA) has found this credit to be worthwhile to pursue, as safety should live in every aspect of a construction project.  However, the team noted that it would hav

1
Mon Jan 15, 2024, 8:41 am

Sealant for Pipe fittings

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Osama Touni  on 

hi everyone, 

we have pipe fitting sealant and the VOC Content that mentioned in the MSDS is 11% what is this mean ? 

Thanks 