Forum quick links
Planning for Resilient Outcomes
posted by Bryna Dunn on
The Planning for Resilient Outcomes Working Group has had a few preliminary meetings and we would like to invite interested Green Gurus to join our group. To give you an idea of what we
Looking for 1 more point!
posted by Jeannie Rueter on
We recently received technical advice on our preliminary construction review. They asked for documentation to support the regional credit.
Extent of Signage
Schools-NC-v4 EQp2:Environmental tobacco smoke controlposted by Summer Minchew on
On a LEED for Schools project do you ONLY have to post signage at the property line adjacent to all pedestrian and vehicular entrances indicating the no-smoking policy for the school site or i
Envelope Cx - Blower door test
NC-v4 EAc1:Enhanced commissioningposted by Miguel Ángel Blanco on
Hello All, We have a 5-floored building pursuing LEED CS v2009 certification, and also WELL certification. Envelope Cx is required.
Envelope Commissioning Deficiencies
NC-v4 EAc1:Enhanced commissioningposted by Jesse Klobuchar on
Hello Everyone,
I hope that everyone is well. I am new to the forum. I appreciate all of the contributions that people make here to make LEEDuser what it is.
Independent 3rd Party CxA and Technology Design
NC-v4 EAc1:Enhanced commissioningposted by Ryan Hoffman on
Our firm is a MEP/T firm that also has a large Building Optimization practice (LEED Consulting, Energy Modeling, Commissioning, etc.). For a project in which we are hired for the Technol
Including envelope in OPR and BOD when envelope is not part of the CI scope
CI-v4 EAp1:Fundamental commissioning and verificationposted by Elizabeth Powers on
Hi folks,
zEPI - Documentation requirements
Pilot-Credits EApc143:Zero Energy Performance Index (zEPI) ACPposted by Oscar Hernandez Wilches on
Dear all,
I was looking at the documentation requirement for this credit. I have a doubt regarding the ASHRAE 90.1 :
This is the requirement :
Existing Interior: Water bill based on floor area
EBOM-v4.1 WEc1:Water Performanceposted by ERM Korea on
hello, we are seeing request of LEEDv4.1 Existing Interior (EI) projects. project that was requested is office space of a building.
Lighting for handrails near stairs
CS-v4 SSc6:Light pollution reductionposted by Chen Shalita on
Hello, in ש project we are working on, there are lighting fixtures under the handrails that illuminate downwards towards a staircase.