Whether to open an awarded MRc4 in order to correct a pending MRc7.
NC-2009 MRc4:Recycled Contentposted by Jeff Wiedmeyer on
The USGBC reviewer has pointed out that per LEED Interpretation 10372, wood materials that contain both recycled content and FSC certified wood content, cannot be counted twice - which makes sense,
Lighting system out of tenant scope
CI-v4 EAp2:Minimum energy performanceposted by Omar Elrawy on
For this requirement: "Areas and systems that are not part of the tenant scope of work are exempt."
Just to confirm that my understanding is correct
Unmetered Energy Agreement
NC-v4 EAp3:Building-level energy meteringposted by Joseph Snider on
Hi - I have a very strange scenario. The local utility company is providing the site and parking lot lighitng, including installing it and maintaing it. They are NOT metering it.
Zero Tool website down
posted by Tiffany Broyles Yost on
Zero Tool has an expired certificate and isn't functioning. https://zerotool.org/zerotool/
Getting access to building energy data
posted by Christopher Schaffner on
We've been doing some work gathering actual energy data on our recent projects.
Upcoming Webinar: Behind the Scenes: COTE Top Ten 2021
posted by Jennifer Zakrzewski on
Hello Green Gurus,
Here’s one more exclusive webinar for you! Coming up next week:
non-potable water for wc and urinal flushing means the flow rate for potable water is zero, right?
NC-v4 WEp2:Indoor water use reductionposted by Afogreen Build on
Hi all,
Regarding Indoor Water Use Reduction Credit
Refurbishment project on an existing estate (sort of campus/ business park)
CI-v4 LTc4:Bicycle facilitiesposted by R Jones on
Hi - our project is located on an estate which at the entrances to the estate would meet the 200m distance to bike networks.
Underground infiltaration system as LID practice?
NC-v4.1 SSc4:Rainwater Managementposted by Barbara Beckmann on
For our project a underground infiltration system is planned. Now we are wondering whether a underground infiltaration system counts as a LID practice?
Construction related credits in a LEED Design submission (LEED Online process)
posted by Stefen M on
Hi all,
We are in the process of submitting a design review for a LEED project. This
may be a simple question, but what should we do regarding targeted credits