Forum quick links
Demolishing an existing school with asbestos
Schools-NC-v4 MRc5:Construction and demolition waste managementposted by Priscillia Champagne on
We are currently working on a school project that will be completed in several phases. An existing school is located on the project site and will be occupied until the new building is constructed.
Monthly Evapotranspiration Rate
NC-v4 WEp1:Outdoor water use reductionposted by Ahmed Labeeb on
Dear,
No residential buildings
NC-v4 LTc4:Surrounding density and diverse usesposted by Zeynep Cakir on
Our project is located in an organized industrial zone.
Existing base building fixtures
CI-v4 EQc6:Interior lightingposted by Omar Elrawy on
We have an interior fit-out project, in which we are trying to comply with Option 2 (A, B, C, and D)
Pre-selected sites, can a project still opt for Integrative Process credit?
NC-v4 IPc1:Integrative processposted by Nermin Hegazy on
We are studying the feasibility of acheiving LEED certification for a series of floors in an office building.
Exemplary Performance - Apply and don't earn?
posted by Kelsey Wotila on
We're on the threshold of qualifying for Exemplary Performance. We are doing a split review.
Sharing with each other our areas of expertise
posted by Jerelyn Wilson on
Hello Sustainable Advising members,
PV Farm adjacent to Datacenter
Data-Centers-NC-v4.1 EAc2:Optimize Energy Performanceposted by Amal Venugopal on
Greetings!
The proposed Datacenter building is intended to achieve LEED certification under LEED v4.1 BD+C Rating system – Datacenter.