Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Window Contacts / FCU Operations

Green Commons
posted by  Allison Wilson  on 

Hi there Hive Mind! Hope everyone's doing well and staying cool in the heatwave all over.

2
Director of Sustainability
Lorax Partnerships, LLC
LEEDuser Basic Member
0 thumbs up
Wed Aug 17, 2022, 1:40 pm

Lighting tab - unconditioned spaces

NC-v4 EAp2:Minimum energy performance
posted by  Paul Caicedo  on 

Hello,

I am using DesignBuilder to export the minimum energy performance calculator spreadsheet; unconditioned spaces are not filled in the Tab Lighting.

1
Wed Aug 24, 2022, 11:02 pm

Does recessed lighting under a canopy have to be accounted for in SSc6?

CS-v4 SSc6:Light pollution reduction
posted by  Wen Zhang  on 

We are working on a project where recessed pot lights are installled under a canopy.

1
Fri Aug 19, 2022, 2:09 pm

Prefabricated or modular structure Buildings

NC-v4 MPR1:Must be in a permanent location on existing land
posted by  VISHAL JAIN  on 

Hello,

Would like to know more details on how "Prefabricated or modular structure Buildings" can be certified under LEED. 

0

Innovation - PILOT - ergonomics approach for computer users

NC-v4 INc1:Innovation
posted by  Anina Mbilinyi  on 

I registered EQpc44 on March 4, 2021 with V4.0 project.  The documents are complete and went to LEED Online to finalize documentation and the pilot credit was gone from the form.

0

Electric heat pumps - share of EE according to german law

NC-v4.1 EAc5:Renewable Energy
posted by  J Schütz  on 

Dear all,

for our projects in germany its quite controvers to communicate towards the project teams, why electric heat pumps cannot contribute to the credit renwable energy.

1
Wed Aug 17, 2022, 2:00 pm

Achieving prerequisite for project that was converted from VRF to DCS

CS-v4 EAp2:Minimum energy performance
posted by  K Pomperada  on 

I am working with a project with design revisions from VRF to DES.  How can we meet prerequisite if the the initial evaluation chiller efficiency is 0.63 kW/TR (Cooling Capacity is 2300TR&nbsp

1
Tue Oct 4, 2022, 8:11 pm

Water test location

EBOM-v4 WEc3:Cooling tower water use
posted by  Omar Elrawy  on 

Dear all,

Should we test makeup water from the water source (incoming), or from inside the cooling tower itself?

2
Project Director
WSP USA
LEEDuser Basic Member
381 thumbs up
Tue Aug 16, 2022, 6:04 pm

SSpc158 Feedback Survey errors

Pilot-Credits SSpc158:Onsite Carbon Sequestration Through Plantings
posted by  Courtney France  on 

FYI, or updates from others welcome if fixed online, Feedback Survey hosted through WUFOO for SSpc158 was errored.  Required responses for SSpc154 thru 158, even though project was not applica

1
Fri Aug 19, 2022, 12:21 am