Post a question or comment
Filter by location
Forum
Topic
Replies
Recent
2
Sustainable Design Lead
CannonDesign
LEEDuser Expert
379 thumbs up
Wed Aug 10, 2022, 5:41 pm
5
Sustainable Design Leader
HKS
LEEDuser Basic Member
3 thumbs up
Wed Aug 10, 2022, 4:34 pm
3
Wed Aug 10, 2022, 4:06 pm

validity of LEED certificate (LEED-CS v2009); necessary period of USGBC membership

Performance Period
posted by  Ernst Schriefl  on 

We are in the process of certifying several buildings under a campus approach (LEED Master Site D+C), where each building / project is certified unter the LEED-CS v2009 rating system.

3
Default Avatar
Senior Consultant
ES EnviroSustain GmbH
LEEDuser Premium Member
17 thumbs up
Wed Aug 10, 2022, 3:29 pm

Evaporative Cooling Fan is not available to meet No Cooling Tower option?

Pilot-Credits WEpc94:No Cooling Tower
posted by  Esteban Martinez  on 

We are working on a project without Cooling Tower, also the HVAC system has an Evaporative Cooling Fan.

Does this make that the project can not pursue this credit? 

0

Minimum IAQ Performance Calculator - Multiple Zone and 100% OA

CI-2009 IEQp1:Minimum IAQ Performance
posted by  Ron Dean  on 

I have difficulty filling out the Minimum IAQ Performance Calculator table for multiple zones.

3
Head of Energy & Environmental Management
EB Project Management | Green Building Consultants
LEEDuser Basic Member
14 thumbs up
Wed Aug 10, 2022, 2:06 pm

Requirement for compliance for this pilot credit

Pilot-Credits EQpc117:Quality views in nonregularly occupied spaces
posted by  Anshuman Vashistha  on 

To show compliance, can the project team submit their own calculator considering only non-regularly occupied spaces and non-regularly occupied spaces with qualty views ?

0

Credit compliance requirement for LEED V4 - Option 1

CI-v4 EQc7:Daylight
posted by  Anshuman Vashistha  on 

We have a CI project attempting the daylight credit through option 1 - sDA and ASE simulation as per LEED.

0

Site Management Plan Evidence

EBOM-v4.1 SSc4:Site Management
posted by  Amgad Khattab  on 

Hi

I'm confusing about site management evidence because the required documention not mentioned any evidence to be provided. ONLY Site Management Plan!!

0