Kitchen faucet nominal flow rate vs maximum flow rate
CI-v4 WEp1:Indoor water use reductionposted by shashank gangil on
We are doing a CI project in Hong Kong and going to select a kitchen faucet for installation in the pantry.
Heat recovery HVAC
NC-v4.1 EAp2:Minimum Energy Performanceposted by Josef Andersen on
Hi!
We are currently discussing a design solutions for the HVAC in a project that should fulfill LEED requirements.
option 2, additional source control and monitoring
CS-v4 EQc1:Enhanced indoor air quality strategiesposted by James Cai on
Hi,
Can the installation of PM2.5 sensor meet this requirement?
Chinese Green Electricity Certificate "GECs"
NC-v4.1 EAc5:Renewable Energyposted by Josef Andersen on
Hi!
It came to my knowledge that USGBC does not accept Chinese Green Electricity Certificate "GECs".
20 kinds of permanent installation materials
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by FEI WANG on
We have a hotel project, the use of high-grade wallpaper, valid for more than 10 years, can be counted as permanent installation materials
Campus approach or not, advantages and disadvantages?
posted by Josef Andersen on
Dear LEED colleagues!
I am working on Volvo with sustainability concerning our new constructions globally.
ASHRAE 90.1-2010 Table 6.8.1c
NC-v4 EAp2:Minimum energy performanceposted by study topenergy on
Hello,
INpc136 - Safety First: Re-Enter Your Workspace
Pilot-Credits INpc136:Safety First: Re-Enter Your Workspaceposted by Kelvin Chan on
Our project is located in Hong Kong.
IPc101 - Integrative Process - good practice
Pilot-Credits IPpc101:Integrative Processposted by Kelvin Chan on
It is recommended to set up an integrative team with all stakeholders at the early stage, prior to commencement of the project, the team shall establish an Integrative Process (IP) Team.