Phased Development - Demoing Building for Parking Lot
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Deb Favaretto on
Hi,
62.1 vs 170
NC-v4 EQp1:Minimum indoor air quality performanceposted by Dianne Herrin on
Hello - I am working on a new construction VA Medical Center that has been designed using the ventilation rates in ASHRAE Standard 170-2008 as per the v4 NC-Healthcare.
Gross Floor Area for Flushouts
NC-v4 EQc4:Indoor air quality assessmentposted by Cory Duggin on
Should the penthouse be included in the gross area used to calculate the flush out volume? Also, does it have to be specific on a system by system basis, such as the area of the floor served
Daylight modeling software for LEED v 4.0/4.1 (for Revit)
posted by Dan Jaconetti on
Our building scientist has been using Insight 360 to model daylight and document it for LEED certifications. However, it appears that Autodesk is no longer fully supporting the tool and may e
Modeling a warehouse that is divided into multiple typical units
CS-v4 EAc2:Optimize energy performanceposted by Michael on
My project is a big dry warehouse, which is divided into 7 typical units for future tenants. There is a small office with AC in each unit.
RECs for project supplied by campus central utility plant?
NC-v4 EAc7:Green power and carbon offsetsposted by Erin Holdenried on
Can RECs be used for project located on a campus with a central plant that generates its own electricity for the campus? It is a cogen plant that also supplies steam and chilled water.
Low Emitting Materials Calculator and Precast Wall Panels
NC-v4 EQc2:Low emitting materialsposted by Teaaron Frye on
In regards to the low emitting materials calculator (v4.1) what is the proper way to document insulated and non-insulated precast concrete wall panels.
HVAC limited scope of works
NC-v4 EAp2:Minimum energy performanceposted by Nikos Tsitsikas on
Hi everyone,
Commissioning Budget
CI-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Seung Shin Na on
Still I don't have many experiences on LEED project so it is hard to guess the range of commissioning cost.