According to page 46 the LEED reference guide, it states the following: (FOR SCHOOLS - If a school bus system is being counted as 1 of the required bus lines to meet the requirements of Option 2, exemp perf can be achieved by locating the project with "1/2" mi of at least 1 or more stops for 2 or more public bus lines.) Considering that the standard credit is limited to 1/4 mi this seems too good to be true, but the LEED online template does not acknowledge this option. Anyone have any insight if the above is a typo by USBGC or if this is a valid?
You rely on LEEDuser. Can we rely on you?
LEEDuser is supported by our premium members, not by advertisers.
Add new comment
To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.