Topic | Recent |
---|---|
ReflectanceNC-v4 EQc6: Interior lightingposted by Inês Marques on Apr 4, 2017, 2:12 pm
Hi guys, I'm having troubles getting datasheets with reflectance values for the project I'm working on. Last reply: Kera Lagios, Mar 4, 2020, 12:38 pm |
|
USGBC-approved equivalent standard for projects outside the U.S.NC-v4 EAp2: Minimum Energy Performanceposted by Isabel Santos on Jun 23, 2016, 11:51 am
Dear all, We are a consultant company beginning the application for LEED v4 certification of a major renovation project. Last reply: Marcus Sheffer, Feb 5, 2020, 1:15 pm |
|
General Emission EvaluationNC-v4 EQc2: Low-emitting materialsposted by Vânia Marinho on Dec 15, 2017, 11:03 am
Hello everyone, If possible, I need some help with the following: According to the reference guide for projects outside the US, the products have to be tested to either CDPH or AgBB... Last reply: Scott Steady, Feb 3, 2020, 2:51 pm |
|
Baseline building: daylight controlsNC-v4 EAp2: Minimum Energy Performanceposted by Ricardo Sá on Oct 3, 2017, 8:11 am
Hi, my question is related with the need to consider (or not) daylight controls in baseline building. Table G3.1 (bullet 6) from ASHRAE 90.1-2010 states the following: 1) Proposed... Last reply: Keith Robertson, Nov 27, 2019, 2:57 pm |
|
Unfinished space- CafeteriaNC-v4 EAp4: Fundamental Refrigerant Managementposted by Ricardo Sá on Aug 30, 2019, 7:04 am
Hello, I'm working on a project that has an unfinished space, but it is meant to be a cafeteria. I'm assuming that being a cafeteria, the space will have some sort of commercial... |
|
Airport projects- LEED NC-v4: LT c4 Surrounding density and diverse usesNC-v4 LTc4: Surrounding density and diverse usesposted by Ricardo Sá on Sep 4, 2018, 12:08 pm
Dear All, Last reply: Deborah Lucking, May 14, 2019, 4:40 pm |
|
Only commuter rail frequency complies with requirementsNC-v4 LTc5: Access to quality transitposted by Ricardo Sá on Apr 15, 2019, 12:58 pm
Dear All we are evaluating the possibility of certifying a distributrion center. In what related LT C5 (“Access to Quality Transit”):
|
|
LEED Certification- Buildings inside a campusLEED Rating System Selectionposted by Ricardo Sá on Apr 10, 2019, 10:29 am
Dear All, we were contacted to make a commercial proposal for the LEED certification of 3 interdependent buildings located in the same campus:
|
|
Refrigerated Storage rooms ventilation requirementsNC-v4 EQp1: Minimum indoor air quality performanceposted by Luis Andrade on Feb 1, 2019, 1:12 pm
Hello, I have a doubt regarding the need to ventilate refrigerated warehouses or storage rooms. As per Addenda L of ASHRAE 62.1 - 2010, refrigerated strorage rooms with a cooling... Last reply: Dave Hubka, Mar 21, 2019, 7:53 am |
|
Flush-out- Hotel FacilityNC-2009 IEQc3.2: Construction IAQ management plan - before occupancyposted by Luis Andrade on Jan 22, 2019, 3:11 pm
Hello, I'm currently working in a project that is a hotel facility. The HVAC system type are 100% DOAs across the project and FCUs. However I'm having a problem regarding the... Last reply: Dylan Connelly, Mar 4, 2019, 10:02 pm |