Topic | Recent |
---|---|
New Safety First Pilot CreditsPilot-Credits INpc137: Cleaning and Disinfecting Your Space for Emerging Pathogensposted by Sam Fagan on Jul 17, 2020, 6:10 amBrightworks Sustainability Brightworks Sustainability LLC LEEDuser Premium Member 46 thumbs up September 30, 2020- 11:28 am POST FOR INpc136: Agreed- Also, there is not a forum for INpc136, which is needed, as noted in the Pilot Credit Survey. Log in or register to post comments ... Last reply: Brightworks Sustainability, Sep 30, 2020, 11:28 am |
|
Leed and wellNC-v4.1 EQc9: Acoustic performanceposted by miles woolley on Sep 17, 2020, 3:27 pm
We have an office project that looks at achieving both Leed and Well guidance for acoustics. Does anyone have similar experience? And if so which was the overriding criteria? |
|
Green power and carbon offsets- 100% Electric BuildingCS-v4 EAc7: Green power and carbon offsetsposted by Wayne Mc Fall on Sep 13, 2020, 5:39 pm
Hi All, We are working on a 100% electric building pursuing LEEDv4 BD+C: Core and Shell. The client would like to explore the option of pursuing the... Last reply: Wayne Mc Fall, Sep 14, 2020, 11:53 am |
|
Baseline- Building Type- Mixed energy supplyNC-v4 EAp2: Minimum Energy Performanceposted by L on Sep 3, 2020, 5:39 am
Hi! A building being designed for having a mixed yearly energy supply covering heat demand which consists of partly purchased heat (district heating from city network) and partly ground... Last reply: Marcus Sheffer, Sep 8, 2020, 10:54 am |
|
Nonattainment area for PM2.5EBOM-v4.1 EQp1: Minimum Indoor Air Qualityposted by Sarah Birchall on Sep 2, 2020, 12:43 pm
How do I find out if my project (which is located in the UK) is in a nonattainment area for fine particulate matter (PM2.5)? |
|
Occupancy within the Minimum_IAQ_Performance_CalculatorData-Centers-NC-v4 EQp1: Minimum indoor air quality performanceposted by Sarah Birchall on Aug 11, 2020, 10:28 am
For the occupancy within the Minimum_... |
|
U.S. Department of Energy’s (CBECS) database- data on the websiteCI-v4 EAc6: Green power and carbon offsetsposted by Karen Elliott on May 13, 2019, 4:51 am
Dear All We used prescriptive option on Minimum Energy Performance, so looking to calculate out energy use via U.S. Department of Energy’s Commercial Buildings Energy Consumption Survey (... Last reply: Marcus Sheffer, Aug 11, 2020, 8:48 am |
|
Four buildings in one certification?Mid-Rise-v4 MPR2: Must use reasonable LEED boundariesposted by Maria Perzon on Jan 13, 2020, 10:31 am
I am working with a customer discussing LEED certification for four similar residential buildings. They have only minor variations. Would it be possible to lower the costs by certifying it as one... Last reply: Samuel Sura, Aug 10, 2020, 9:15 am |
|
Minimum planted area (that needs no irrigation)CS-v4 WEc1: Outdoor water use reductionposted by Maria Porter on Oct 30, 2017, 8:05 am
Hi! In v2009 there used to be a 5 % minimum for the area that needed to be planted in order for the project to be eligible for the credit. Is there such a threshold now? Or does basically... Last reply: Maria Porter, Aug 10, 2020, 8:01 am |
|
Batteries, mercury-containing lamps, and electronic wasteNC-v4 MRp1: Storage and Collection of Recyclablesposted by Maria Porter on Dec 19, 2019, 7:11 am
Chose to provide a recycling area for two of: batteries, mercury-containing lamps, and... Last reply: Holly Ratafia, Jul 2, 2020, 11:12 pm |