Alternative structure and enclosure limit
CS-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Susan Heinking on
My team is working on a project that involves a high quantity of structural material and according to the handbook, "Structure and enclosure materials may not constitute more than 30% of the value
Sidewalk as bike trail?
NC-v4 LTc6:Bicycle facilitiesposted by Rob Hink on
Will a concrete sidewalk adjacent to the roadway qualify as a bike path to meet the bike network requirement?
Frequency of Analysis
EBOM-v4 EAc3:Ongoing commissioningposted by Walker Johnson on
This credit states that the frequency of analysis should be at least quarterly in the first year. It doesn't state what specific analysis should be done though. Does anyone have guidance on this?
Earthquake preparedness
Pilot-Credits IPpc99:Design for Enhanced Resilienceposted by Andrew Ondersma on
Our project pursued this pilot for Earthquake specific design measures.
LT CREDIT: SENSITIVE LAND PROTECTION -Developed land within <100 ft from waterbodies
NC-v4 LTc2:Sensitive land protectionposted by Ricardo Filho on
Hello, do these 2 rules:
Water bodies. Areas on or within 100 feet (30 meters) of a water body, except for minor improvements.
Environmental noise impacts constantly evolving
Pilot-Credits EQpc57:Enhanced acoustical performance - exterior noise controlposted by Andrew Ondersma on
For this credit our project had a unique challenge in that many adjacent city blocks were also under construction meaning that the environmental noise impacts to our site would be constan
Any constraint on the location?
Pilot-Credits SSpc83:Offsite Financial Support for Habitat Protectionposted by Yoyo Shek on
Hi All,
Originally in the Credit language Option 2:
Green roof & green wall
CS-v4 SSc2:Site development - protect or restore habitatposted by Yoyo Shek on
Hi All,
Preferred parking/ Charging stations allocated off - site
NC-v4 LTc8:Green vehiclesposted by on
We have a project on a university campus that will have no new parking associated with the project. However, the design team is hoping to achieve points for LTc8.