Alternative structure and enclosure limit

CS-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials
posted by  Susan Heinking  on 

My team is working on a project that involves a high quantity of structural material and according to the handbook, "Structure and enclosure materials may not constitute more than 30% of the value

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Fri Mar 15, 2019, 10:01 am
1
Thu Mar 21, 2019, 12:00 pm

Sidewalk as bike trail?

NC-v4 LTc6:Bicycle facilities
posted by  Rob Hink  on 

Will a concrete sidewalk adjacent to the roadway qualify as a bike path to meet the bike network requirement?

3
Sustainable Design Director
Boulder Associates Architects
LEEDuser Premium Member
20 thumbs up
Thu Mar 14, 2019, 11:09 pm

Frequency of Analysis

EBOM-v4 EAc3:Ongoing commissioning
posted by  Walker Johnson  on 

This credit states that the frequency of analysis should be at least quarterly in the first year. It doesn't state what specific analysis should be done though. Does anyone have guidance on this?

3
Sustainability Consultant
Incoma Engineering and Consultancy
LEEDuser Basic Member
0 thumbs up
Thu Mar 14, 2019, 9:01 pm

Earthquake preparedness

Pilot-Credits IPpc99:Design for Enhanced Resilience
posted by  Andrew Ondersma  on 

Our project pursued this pilot for Earthquake specific design measures.

0

LT CREDIT: SENSITIVE LAND PROTECTION -Developed land within <100 ft from waterbodies

NC-v4 LTc2:Sensitive land protection
posted by  Ricardo Filho  on 

Hello, do these 2 rules:

Water bodies. Areas on or within 100 feet (30 meters) of a water body, except for minor improvements.

3
Thu Mar 14, 2019, 6:01 pm

Environmental noise impacts constantly evolving

Pilot-Credits EQpc57:Enhanced acoustical performance - exterior noise control
posted by  Andrew Ondersma  on 

For this credit our project had a unique challenge in that many adjacent city blocks were also under construction meaning that the environmental noise impacts to our site would be constan

0

Any constraint on the location?

Pilot-Credits SSpc83:Offsite Financial Support for Habitat Protection
posted by  Yoyo Shek  on 

Hi All,

Originally in the Credit language Option 2:

1
Mon Jun 10, 2019, 4:06 pm
1
Mon Mar 18, 2019, 6:20 pm

Preferred parking/ Charging stations allocated off - site

NC-v4 LTc8:Green vehicles
posted by     on 

We have a project on a university campus that will have no new parking associated with the project. However, the design team is hoping to achieve points for LTc8.

4
Senior Sustainability Strategist
Glumac
LEEDuser Premium Member
14 thumbs up
Wed Mar 13, 2019, 9:07 pm