Topic | Recent |
---|---|
ID+C Fundamental Air QualityLEED v5 BD+C/ID+C: Materials and Resources 2nd Public Commentposted by Annie Ingraham on Oct 25, 2024, 9:54 am
With respect to the USGBC goal of using more broad language, the most sustainable building equipment, are those that function optimally for the longest period of time. Adding 10 linear feet... |
|
LEED v5 IEQLEED v5 BD+C/ID+C: Indoor Environmental Quality 2nd Public Commentposted by Annie Ingraham on Oct 25, 2024, 9:59 am
With respect to the USGBC goal of using more broad language, the most sustainable building equipment, are those that function optimally for the longest period of time. Adding 10 linear feet... |
|
Parking Generation Manual 5th editionNC-v4.1 LTc7: Reduced parking footprintposted by Takayuki Hirota on Sep 18, 2019, 4:52 am
In the addenda published on 7/25/2019, Transportation Planning Handbook is replaced with Parking Generation Manual, 5th edition, only in Further Explanation, Bullet 1 and Referenced Standards.... Last reply: Louwna Joubert, Oct 25, 2024, 9:22 am |
|
Building Product Disclosure and Optimization, Additional Resources (Table 2): Product Documentation Multi-Attribute ScoringLEED v5 BD+C/ID+C: Materials and Resources Public Commentsposted by Michael Scharpf on Oct 25, 2024, 7:52 am
Propose to adding CSC to the eligible certifications in this section, with applicability across Climate Health, Human Health, Circular Economy and Ecosystem Health... |
|
Open Building Product Disclosure and Optimization credit for structural materialsLEED v5 BD+C/ID+C: Materials and Resources Public Commentsposted by Michael Scharpf on Oct 25, 2024, 7:19 am
The scope is limit to finishing products only, whereas structural materials account for +60% of a building's mass. Beyond climate protection, the responsible sourcing of construction... |
|
LCA for only furniture, is it possible?CI-v4.1 MRc2: Interiors life-cycle impact reductionposted by Eslam Ahmed on Oct 9, 2024, 3:53 pm
We are currently working on a LEED ID+C certification project. It involves a rental space where our customer is just the tenant, who will take over the space fully finished. He is only... Last reply: Eslam Ahmed, Oct 25, 2024, 5:42 am |
|
Double-counting non-roof measuresNC-v4 SSc5: Heat Island Reductionposted by Jacopo Cattaruzzi on Oct 21, 2024, 9:32 am
Hi, I have a parking lot inside my project boundary which is partially covered by PV panels while some portions are covered by trees canopy. It also have open-grid pavement. Should I... Last reply: Jacopo Cattaruzzi, Oct 25, 2024, 2:42 am |
|
Heat Island with Solar PanelsNC-v4.1 SSc5: Heat Island Reductionposted by Anna Pooler on Oct 24, 2024, 10:42 am
Hello, I'm working on a project that has a solar array covering the majority of the roof. Can we exempt the panels from the roof calculations for Heat Island Reduction? LEED... Last reply: emily reese moody, Oct 25, 2024, 12:39 am |
|
EA Prerequisite: Operational Carbon Projection and Decarbonization Plan- BPS rqmtLEED v5 BD+C/ID+C: Energy and Atmosphere 2nd Public Commentposted by Jamy Bacchus on Oct 24, 2024, 4:25 pm
I would strike the 2nd draft inclusion of reviewing any regional BPS if it's in GHGi. There are some state and local BPS which are GHGi-only or such as Colorado's which has both a site EUI and... |
|
EA Prerequisite: Operational Carbon Projection and Decarbonization PlanLEED v5 BD+C/ID+C: Energy and Atmosphere 2nd Public Commentposted by Jamy Bacchus on Oct 24, 2024, 4:16 pm
The current scope within this prerequisite only includes the B6 module emissions from operational emissions and ignores B1, B7 and C1 emissions which are attribuatable to operations. That is,... |