LED Wall washer calculationLEED v4.1 Discussion Forumposted by Martina Vázquez on Feb 1, 2023, 6:35 am
Good morning, I've been studing LEED v4.1 document and it is almost all of it for streetlight projects, but we have a proposal based in wall-washer the exterior facade. I don't really know... |
|
System 2 as the baseline system for the whole projectNC-v4 EAp2: Minimum Energy Performanceposted by Amal Venugopal on Jan 21, 2023, 8:29 pm
We are doing the energy model for one of our projects. This project is a luxurious resort with LGF, GF, 1F & 2F will be located in KSA. Greetings!... We have a question regarding the... Last reply: Marcus Sheffer, Jan 27, 2023, 2:01 pm |
|
Resort: Baseline HVACNC-v4 EAc2: Optimize Energy Performanceposted by Amal Venugopal on Jan 23, 2023, 3:07 am
Greetings!... We are doing the energy model for one of our projects. This project is a luxurious resort with LGF, GF, 1F & 2F will be located in KSA. We have a question... Last reply: Marcus Sheffer, Jan 27, 2023, 2:00 pm |
|
Commingled Waste approach in storage locations for recyclable materialsEBOM-v4.1 MRp3: Waste Performanceposted by Maysoon Al-Khuraissat on Sep 20, 2022, 9:59 am
I'm working on a huge existing Mall, Is the... |
|
PV Solar Panels outside LEED BoundaryNC-2009 EAc2: On-Site Renewable Energyposted by Ammar Yahia on Aug 25, 2022, 3:56 am
A New Construction Project in which the PV panels to be installed on a "330,000 SQM roof of an airport terminal building project" to offset 22% of annual energy cost. Is it possible to... Last reply: Marcus Sheffer, Aug 25, 2022, 8:50 am |
|
Prefabricated or modular structure BuildingsNC-v4 MPR1: Must be in a permanent location on existing landposted by VISHAL JAIN on Aug 17, 2022, 8:53 am
Hello, Would like to know more details on how "Prefabricated or modular... |
|
Decorative lighting fixturesNC-v4.1 EQc6: Interior lightingposted by Ellis John Mandia on Aug 9, 2022, 6:32 am
Are decorative lighting fixtures such as chandeliers, wall sconces, and table lamps, that are within regularly occupied space included in the requirements to comply with luminance of less than 2,... Last reply: Glenn Heinmiller, Aug 9, 2022, 11:50 am |
|
Advanced Energy Metering Owner & Tenant spacesCS-v4 EAc3: Advanced Energy Meteringposted by Aishwarya Chengappa on Jul 20, 2022, 2:24 am
I have a G+6F C&S office building with 2 office spaces in each floor, which will be metered separately as per the local law. Although the owner of the building will be accommodating one of... Last reply: Marcus Sheffer, Jul 22, 2022, 11:17 am |
|
LEED OM V4.1 Location problemEBOM-v4.1 LTp1: Transportation Performanceposted by Saba Hajizadeh on Jun 21, 2022, 6:14 am
Hello everyone, I'm working on a project, the location of this building is Iran, but I couldn't find it on the ARC website. Do you have any suggestions? What should I do? ... |
|
Compliance of Lighting fixturesNC-v4.1 EQc6: Interior lightingposted by Ellis John Mandia on May 23, 2022, 1:52 am
Hello all, Here is a actual problem I have encountered. What will happen if the lighting consultant has provided the necessary documents that comply with all the requirements for the... |