Topic | Recent |
---|---|
Prescriptive Method for IEQ 8.1NC-2009 IEQc8.1: Daylight and views - daylightposted by Kristian Kicinski on Mar 29, 2017, 5:23 pmguide and credit never does and this is why we have Lis and addendas and people on forums like these. The prescriptive method is simple calc based on ratios rules of thumbs established in daylighting... Last reply: Kristian Kicinski, Mar 31, 2017, 10:55 am |
|
Owner Supplied Furniture- non-residentialNC-v4 EQc4: Indoor air quality assessmentposted by Leanne Conrad on May 1, 2017, 5:31 pm
We are approaching the start date of our... Last reply: emily reese moody, Oct 1, 2021, 12:45 am |
|
Question about ASE study areaNC-v4 EQc7: Daylightposted by Jackie Cheung on May 4, 2017, 11:04 pm
Hello everyone. May I ask 2 questions about this credit? A) Assuming a project go for option 1. In... Last reply: TODD REED, Aug 30, 2017, 2:27 pm |
|
Project with no off-street parking spacesND-Plan-v4 NPDc5: Reduced parking footprintposted by Noriko Nagazumi on Jun 13, 2017, 4:04 am
Hi, Our project has no off-street parking spaces. Does this project automatically meet the third requirement of this credit, "Provide carpool or shared-use vehicle parking spaces... Last reply: Noriko Nagazumi, Jun 26, 2017, 12:41 am |
|
Option 3 fueling capacity determined by time limit?NC-2009 SSc4.3: Alternative transportation - low-emitting and fuel-efficient vehiclesposted by Erica Downs on Jul 18, 2017, 4:32 pm
Our project is at a large university, and a 2-plug Level 2 station has been installed. As with others, we are struggling with the "vehicle fueling capacity per station (8 hour day)" part... Last reply: Erica Downs, Jul 20, 2017, 11:51 am |
|
Parking garage ventilation- Proposed vs. BaselineNC-2009 EAp2: Minimum Energy Performanceposted by Vassil Vassilev on Aug 2, 2017, 7:32 am
Hi Markus, Last reply: Vassil Vassilev, Aug 11, 2017, 9:43 am |
|
MR credits- which divisions?NC-v4 MRc2: Building product disclosure and optimization - environmental product declarationsposted by LUCY WILLIAMS on Aug 23, 2017, 5:17 pm
The previous versions of LEED limited the MR credits to Divisions 2 through 10 and 12. It excluded MEP materials. Does the new version of LEED allow any material with an EPD (or HPD for that... Last reply: Michelle Robinson Schwarting, Jun 30, 2021, 4:51 am |
|
USGBC rainfall events calculatorNC-v4 SSc4: Rainwater managementposted by Leanne Niu on Nov 29, 2017, 11:01 pm
We could not get the 10 years of the historic daily rainfall data, if we could leave the sheet of historical data blank? and how we calculate the total runoff we need to control on site? Last reply: Olga Yuil, Sep 17, 2018, 1:59 pm |
|
Volume MeasurementNC-v4 MRc5: Construction and demolition waste managementposted by Michelle Rosenberger on Feb 27, 2018, 2:06 pmis monitoring forums like this to see that teams are taxed by impractical LEED v4 requirements as out outline in your last paragraph. Log in or register to post comments RETIRED LEEDuser Expert 623 thumbs up... Last reply: Michelle Rosenberger, Feb 23, 2023, 2:08 pm |
|
Alternative Complaince for large energy userNC-v4 EAp2: Minimum Energy Performanceposted by Vipul Babriya on Mar 12, 2018, 12:19 pm
Hello, We have a very large commercial kitchen facility with significantly large refrigeration load. The total refrigeration load is almost 70% of entire building energy use. As per ASHRAE... Last reply: Jean Marais, Apr 11, 2018, 3:47 am |