Topic | Recent |
---|---|
Bird Collision DeterrencePilot-Credits SSpc55: Bird collision deterrenceposted by Long Wang on Jun 24, 2018, 11:03 am
Hi, I have two questions of this pilot credit for our LEED EB: O+M project V4. First, what specific requirements for the external facade, especially the glass. The other one is the... Last reply: Stephanie Graham, Dec 4, 2019, 5:50 pm |
|
Product Category Testing as per GB China standards.CI-v4 EQc2: Low emitting materialsposted by Mahesh Shankar on Nov 18, 2019, 4:27 am
We have a CI Office project in Shanghai, where we are attempting for Low Emitting materials credit. The testing for three categories of materials that we have, are as per GB China standards. In... Last reply: Reinhard Oppl, Nov 18, 2019, 7:09 am |
|
which standard to be refered to get the LRV of different wall, ceiling and floor?CI-v4 EQc6: Interior lightingposted by Leanne Niu on Nov 5, 2019, 1:58 am
I will submit a project to get this point, but i don't know which standard to be refered for LRV of different materials. Thanks! Leanne Last reply: Kera Lagios, Nov 11, 2019, 8:29 pm |
|
Envelope Cx TestingNC-v4 EAc1: Enhanced Commissioningposted by Erin Rowe on Nov 4, 2019, 8:52 pm
I'm working on a project with envelope... Last reply: ESD Engineer, Nov 4, 2019, 9:46 pm |
|
Equipment Power Density for Plant RoomCS-v4.1 EAc2: Optimize Energy Performanceposted by Chi Hung Yip on Oct 18, 2019, 5:38 am
I need to input a figure for the equipment power... Last reply: Marcus Sheffer, Nov 4, 2019, 6:13 pm |
|
Withdrawal of Appeal?LEED Reviews: Appeals, Design/Construction Submittals, and moreposted by shashank gangil on Oct 20, 2019, 11:14 pm
Hi I need this information urgently. We recently got 83 points for a project after final construction review and 1 point was pending. This pending point is actually Regional priority point... Last reply: Tiffany Beffel, Oct 27, 2019, 7:11 pm |
|
Public Storm Sewer SystemEBOM-v4 SSc2: Rainwater managementposted by Simon S. on Jun 27, 2019, 5:50 am
Hi, Our project in Shanghai City, China is studying whether it is possible to achieve SSc2. According to the local law, existing rainwater trenches were designed to transport rainwater... Last reply: Simon S., Jun 27, 2019, 9:57 pm |
|
How to document the Quality View Simulation Results from IES VE?CS-v4 EQc5: Quality Viewsposted by James Cai on Jan 23, 2019, 2:01 am
I have simulated the quality view in the IES VE and created a report according to the simulation results. while the reviewer said that I need to provide documentation confirming that at least 75... |
|
Proof on Exceptional Calculations of Energy ModellingCS-2009 EAp2: Minimum Energy Performanceposted by Kathy Wong on Jan 7, 2019, 2:13 am
Our LEED project has adopted lighting control as energy-saving strategy for parking garage and documented as exceptional calculation in EAp2 and EAc1. Soon we received USGBC's comment asking for... Last reply: Kathy Wong, Jan 8, 2019, 4:48 am |
|
Project in 2 separate floor of a same building, can they go for one certification?CI-v4 MPR2: Must use reasonable LEED boundariesposted by shashank gangil on Aug 14, 2018, 10:24 pm
We are new to LEED Certification. We are currently bidding for a new LEED v4 ID+C: Commercial Interior Project. The project is currently operating in two floor (26th and 30th), both are separated... Last reply: shashank gangil, Jan 5, 2019, 4:32 am |