Topic | Recent |
---|---|
plasterNC-v4 WEc3: Cooling tower water useposted by Sue Bryant on Aug 17, 2020, 4:39 pm |
|
Soil testing to document restorationNC-v4 SSc2: Site development - protect or restore habitatposted by Beth Johannessen on Aug 18, 2020, 10:46 am
Is a soil test needed both before and AFTER construction to show that soil has been restored? We are tyring to understand how to document the restoration of the soil. We completed soil tests... |
|
Interior Cross-Contamination Prevention- Elevator lobbiesCS-v4 EQc1: Enhanced indoor air quality strategiesposted by MARCIO OROFINO on Aug 20, 2020, 1:10 pm
Dear everyone, |
|
LEED v4.1, ARC and Minimum Requirement EntriesEBOM-v4.1 EQp1: Minimum Indoor Air Qualityposted by Ann Gallogly on Aug 21, 2020, 12:57 pm
I'm a first time LEED project coordinator using the ARC platform to recertify a Existing Building O+M project. Prior to August 15th, 2020 ARC's platform had a way to attach LEED requirements... |
|
New Retail space in an existing mallRetail-CI-v4 LTc5: Reduced parking footprintposted by BEE Incorporations on Aug 23, 2020, 7:08 am
We are designing a retail space that is evaluating this credit. The retail space is in a mall which has designated parking area for store employees only. How do we calculate the parking... |
|
Minimum Requirement for Bicycle Facilities CreditNC-v4 LTc6: Bicycle facilitiesposted by Nuttanee Vongveeranonchai on Aug 25, 2020, 7:30 am
Dear All, I have a question regarding the minimum requirement of the Bicycle facilities credit. Our project is a conference center located in the center of Bangkok, Thailand.... |
|
CLASS 1 AIR SEPERATION DISTANCES_62.1 2010NC-v4 EQp1: Minimum indoor air quality performanceposted by Fotis Kotsopoulos on Aug 25, 2020, 12:24 pm
In case of a central... |
|
On site VOC measurementsNC-v4.1 EQc1: Enhanced indoor air quality strategiesposted by Przemysław Rejczak on Aug 26, 2020, 6:23 am
Dear Everyone, I`ve a question regarding to... |
|
Testing methods accepted for formaldehyde emissions evaluation outside United StatesNC-v4.1 EQc2: Low-emitting materialsposted by Miguel Broncano on Aug 26, 2020, 7:24 am
Dear all, Regarding compliance of Blue Angel certificate with general emissions evaluation, it is neccesary to fulfill an adittional requirement: "The formaldehyde limit of 10 μg/m3 at 28... |
|
MRp2/c5-- Can we count shipping dunnage returned to precast manufacturer as material reuse?NC-v4 MRp2: Construction and demolition waste management planningposted by Terry Thornsbury on Aug 26, 2020, 1:52 pm
We have a large (800,000sf) project that is being constructed primarily using precast floor decks and architectural wall panels. Delivery of these components involves many flatbed trailers using... |