Topic | Recent |
---|---|
Alternative methods of documenting an executed tenant lease agreement?CS-v4 EAc3: Advanced Energy Meteringposted by Allan Robles on Sep 10, 2019, 2:45 pm
Hi there LEEDuser-verse, Has there been anyone who has documented the installation of future tenant metering via a tenant lease agreement or an email acknowledgment between the owner and... |
|
What could be considered as "physically accesible"?NC-v4 SSc3: Open spaceposted by Pablo Muñoz on Sep 12, 2019, 10:59 am
Could we consider physically accesible a roof open to all tenants but without an elevator (the only way to get there is through the stairs)? |
|
Robot parkingCS-v4 INc1: Innovationposted by gabriel Morales on Sep 13, 2019, 12:31 pm
Hello, We have a project in the city of Mexico, the parking is underground with a very special feature, it is robotic, the user will place it in the basement 1 on a platform and from there... |
|
stork parkingNC-v4 LTc8: Green vehiclesposted by Francesco Passerini on Sep 16, 2019, 9:12 am
The Reference guide states: "Preferred parking spaces have the shortest... |
|
Option 4 for the Whole Building Life Cycle Assessment for 3 Credits using ATHENA.Pilot-Credits MRpc63: Whole building life cycle assessmentposted by RICHARD ABRAHAMS on Sep 16, 2019, 3:50 pm
Option 4 requires calculating impacts for both the Baseline Building and the Proposed Building in the following 6 categories: ... |
|
Option 2- zone floor area calculationCS-2009 IEQc8.1: Daylight and views - daylightposted by Edgar Arevalo on Sep 16, 2019, 4:08 pm
When the LEED handbook instructs to calculate the zone floor area by multiplying the... |
|
Prerequisites Vs. CreditsEBOM-v4 EAp1: Energy Efficiency Best Management Practicesposted by Sajedeh Naghavi on Sep 17, 2019, 8:25 am
Hi, I am new to LEED system and in phase 1 of applying for "Certified Level" of an Existing Building (EB); The gap analysis. Based on LEED-v4-... |
|
FSC claim and detailNC-2009 MRc7: Certified Woodposted by Muhammad Kamran Mahmood on Sep 17, 2019, 8:55 am
Hi we have percentage system of FSC in certificate .in certificate they mentioned we can purchase of... |
|
NC-2009 SSc5.1- Site Development—Protect or Restore Habitat- VEGETATED AREASNC-2009 SSc5.1: Site development - protect or restore habitatposted by Maria Peralta on Sep 18, 2019, 7:14 am
Hello!, I have a doubt regarding to this credit. I want to know if orchards, hydroponics and walls with plants, can be considered as a vegetated areas to be count as restored... |
|
Accounting for Sun Shade as view-preserving automated shades and North facing glazing-NC-2009 IEQc8.1: Daylight and views - daylightposted by Edgar Arevalo on Sep 19, 2019, 4:35 pm
Currently the VLTxWFR values for each regularly occupied space is higher than 0.18 However, based on the spreadsheet, those spaces with high VLTxWFR can still be included in the total... |