Forum quick links
Flush Out Challenges
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Jamie Abernethy on
We had enough time (14days) built into the schedule to do a pre-occupancy flushout.
v2.2 project with v3 ID credit
EBOM-2009 MRc4:Sustainable Purchasing—Reduced Mercury in Lampsposted by Saju Varghese on
Can a v2.2 project get this credit even if its a v2009 credit?
Manufacturing Location for Casework
CI-2009 MRc5:Regional Materialsposted by Kevin Dunham on
How do I determine whether custom casework installed on a project meets the 500-mile radius requirement?
Credit Compliance with Un-determined Future Fit-out Space
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Catherine Blakemore on
My project only has scrubs sink, which are exempt from LEED water use reduction requirements. The other portion of my project is undetermined, future fit-out space.
Multiple thermostats averaging
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Stantec BG+LU FW on
If one VAV box with a reheat coil is serving three private offices, would providing one thermostat for each office, and have the controls average the temperature requirement for each thermostat, an
Fenestration SHGC for proposed model
CS-2009 EAp2:Minimum Energy Performanceposted by Ioannis Rizos on
Dear community, According to tables 5.5-1 (climate 1a), the Solar Hear Gain Coefficient for the proposed building should be no more than 0.25.
CS building modeling with tenant design
CS-2009 EAp2:Minimum Energy Performanceposted by Aditya Chemburkar on
Hi, I am modeling a LEED CS building for which we have decided to move ahead considering the tenant space lighting design and HVAC system to achieve maximum energy savings.
Table 1.4
CS-2009 EAp2:Minimum Energy Performanceposted by Paula Hernandez on
Hi Eveybody, I have sent my first energy modeling, and a few commens came back, One of them referred to VAV fan powered terminals, and I copy textually the comment: "Insufficient informatin is prov
Rainfall Event Interval
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Alicia Freire on
Hello, I was wondering if someone could clarify how is the Rainfall Event Interval required to calculate the minimum drawdownrate for a tank calculated. Is this something we need to calculate?
Option 2 on campus - do we need to add a meter for irrigation?
NC-2009 WEc1:Water Efficient Landscapingposted by Lisa Sawin on
We will be tieing the new irrigation system into the existing. Do we need to meter the water use with the LEED boundary?