Is there any protocol for a scenario where there are two buildings joined by an indoor atrium space? One building prohibits smoking, the LEED project, and the adjacent building does not. There are no doors between the atrium and our LEED building; both buildings open up to this indoor atrium. How can we measure the pressure differential under Option 2 if we do not have doors to close?